This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20250304_march_4_2025 [2025/03/04 18:10] nchanove |
uc:uc20250304_march_4_2025 [2025/03/04 18:51] (current) nchanove |
||
---|---|---|---|
Line 3: | Line 3: | ||
---- | ---- | ||
- | Attending: Nancy Chanover (NMSU), Bill Ketzeback (APO), Ben Williams (UW), Aleksandr Mosenkov (BYU), Michael Hayden (OU), Anne Verbiscer (UVa), Moire Prescott (NMSU), Zach Berta-Thompson (CU), Joanne Hughes (Seattle U), Misty Bentz (GSU), Eric Bellm (UW), Gordon, | + | Attending: Nancy Chanover (NMSU), Bill Ketzeback (APO), Ben Williams (UW), Aleksandr Mosenkov (BYU), Michael Hayden (OU), Anne Verbiscer (UVa), Moire Prescott (NMSU), Zach Berta-Thompson (CU), Joanne Hughes (Seattle U), Misty Bentz (GSU), Eric Bellm (UW), Gordon |
- | Russet McMillan (APO), | ||
=== User feedback and comments from institutional representatives === | === User feedback and comments from institutional representatives === | ||
* BYU - nothing to report | * BYU - nothing to report | ||
- | * Colorado - trainees having a great time | + | * Colorado - CU trainees |
* Georgia State - nothing to report | * Georgia State - nothing to report | ||
- | * JHU - no report | + | * JHU - nothing to report |
* NAPG - no report | * NAPG - no report | ||
- | * NMSU - nothing to report - curious | + | * NMSU - Moire had some questions |
- | * Oklahoma - meeting with OU Astro group & VPR to discuss SoonerCam | + | * Oklahoma - there was a meeting with the OU Astro group and their VPR to discuss SoonerCam |
* Seattle - nothing to report | * Seattle - nothing to report | ||
* UVa - nothing to report | * UVa - nothing to report | ||
Line 61: | Line 60: | ||
=== Additional site, telescope and instrument discussion === | === Additional site, telescope and instrument discussion === | ||
- | One onsite user of 3.5m in Feb. First of 2 groups from CU arrived | + | We had one on-site |
- | We are continuing | + | We continue |
- | Agile is back at repair facility; frustration with trying to get camera working. | + | Agile is back at the repair facility |
- | Other instruments performing nominally. | + | Other instruments |
- | APOLLO operational. | + | APOLLO |
- | New TUI available. | + | There is a new version of TUI available. |
- | ARCES flats - reduction software is choking on super-flats. Flats taken throughout | + | A user recently reported an issue with ARCES flats: their reduction software is choking on super-flats. Flats taken during |
---- | ---- | ||
Line 79: | Line 78: | ||
=== 2025 Q1 3.5m scheduling === | === 2025 Q1 3.5m scheduling === | ||
- | UPDATE: Almost | + | The Q1 schedule is almost |
- | + | ||
- | + | ||
- | + | ||
- | We have some unassigned time in Q1 (mostly B halves) - most urgently Feb 08B, but there are a few others in February and March as well. We have received some requests for this time already but if there are any urgent requests or high priority (e.g. students) programs please let us know ASAP, otherwise we will allocate time (at least the slots in the first few weeks of February) to the people who already made requests. This time is listed as OPEN on the Q1 schedule. Users should look at the schedule and follow the usual channels for requesting this time (i.e. email Russet, Amanda, Ben, Nancy and their institutional scheduler when submitting requests, and provide a proposal cover page if you don't already have a program scheduled for the current quarter). | + | |
---- | ---- | ||
Line 89: | Line 84: | ||
=== 2025 Q2 3.5m scheduling === | === 2025 Q2 3.5m scheduling === | ||
- | Got everyone' | + | We received |
---- | ---- | ||
=== 2025 Q1 0.5 scheduling === | === 2025 Q1 0.5 scheduling === | ||
- | One open week, but request | + | There is one open week remaining on the schedule, but a request |
- | Update on camera | + | Update on ARCSAT |
---- | ---- | ||
Line 103: | Line 99: | ||
=== IT Security === | === IT Security === | ||
- | UPDATE: | + | No new announcements, but lots of work is going on behind the scenes. We will remove this item from the monthly agenda and add it back in when we have something new to report. |
---- | ---- | ||
Line 110: | Line 106: | ||
=== Status of new instrument initiatives === | === Status of new instrument initiatives === | ||
- | We still have heard no news from NSF regarding the pre-proposal that was submitted for ASPEN. The UW Telescope Engineering Group has been working on their response to the Ocotillo Critical Design Review report. Preliminary discussions are ongoing about the possibility of replacing Agile with a more modern and capable high-speed imaging camera. We will keep this group posted | + | We still have heard no news from NSF regarding the pre-proposal that was submitted for ASPEN. The UW Telescope Engineering Group has been working on their response to the Ocotillo Critical Design Review report. It will include a revised timeline, which Nancy will share with the Users Committee once the CDR Review Panel has had a chance to react. Preliminary discussions are ongoing about the possibility of replacing Agile with a more modern and capable high-speed imaging camera. There are several elements to the instrument (camera, focal reducer, computer/ |
---- | ---- | ||
Line 116: | Line 112: | ||
=== DIS Decommissioning Plans === | === DIS Decommissioning Plans === | ||
- | UPDATE: Nancy has drafted an instrument decommissioning document | + | The general |
---- | ---- | ||
Line 124: | Line 120: | ||
Open action items from previous meetings: | Open action items from previous meetings: | ||
- | * Nancy: get Mt. Cuba Foundation proposal for new KOSMOS grisms submitted. STATUS: OPEN. The proposal is done; Nancy needs to distribute it to the users who requested the grisms to ensure that their science cases are adequately described. She plans to submit it before the next Users Committee meeting. | + | * Nancy: get Mt. Cuba Foundation proposal for new KOSMOS grisms submitted. STATUS: OPEN. The proposal is done; Nancy needs to confirm with NMSU's Office of Grants and Contracts whether they need to be involved in the submission since it's a small proposal. She plans to submit it before the next Users Committee meeting. |
* Nancy: Ensure that a short description of the impact of satellites be posted on the APO website somewhere and updated every 6 months or so. Nancy received examples of this issue from Anne Verbiscer and will get something added to the current (and new) web site. STATUS: OPEN. | * Nancy: Ensure that a short description of the impact of satellites be posted on the APO website somewhere and updated every 6 months or so. Nancy received examples of this issue from Anne Verbiscer and will get something added to the current (and new) web site. STATUS: OPEN. | ||
* UC reps: remind your users to review the Q1 schedule and request OPEN/DD time if they can make a good case for it. STATUS: OPEN. | * UC reps: remind your users to review the Q1 schedule and request OPEN/DD time if they can make a good case for it. STATUS: OPEN. | ||
- | Open action items from this meeting: | + | New action items from this meeting: |
- | * None. | + | * UC reps: notify your users that there is a new version of TUI that they should download and use. |
+ | * UC reps: ask your ARCES users to look at their flat fields and let the APO staff know if they see issues with changes in flats over the course of an observation. | ||
---- | ---- |