User Tools

Site Tools


uc:uc20250204_february_4_2025

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
uc:uc20250204_february_4_2025 [2025/02/04 18:48] nchanoveuc:uc20250204_february_4_2025 [2025/02/04 18:50] (current) nchanove
Line 79: Line 79:
 === 2025 Q2 3.5m scheduling === === 2025 Q2 3.5m scheduling ===
  
-The allocations were sent to all institutions yesterday; proposals due on February 24. A few items to note: (a) any users who request to use Agile in Q2 should specify a backup instrument, (b) DIS is offered in shared risk mode only and has not been serviced for several quarters, (c) the allocation emails also contain a breakdown of the split between A halves and B halves. Institutions should try to avoid requesting all of their time in A's (or B's) since we will not be able to accommodate everyone's requests.+The allocations were sent to all institutions yesterday; proposals are due on February 24. A few items to note: (1) any users who request to use Agile in Q2 should specify a backup instrument, (2) DIS is offered in shared risk mode only and has not been serviced for several quarters, (3) the allocation emails also contain a breakdown of the split between A halves and B halves. Institutions should try to avoid requesting all of their time in A's (or B's) since we will not be able to accommodate everyone's requests if that happens.
  
 ---- ----
uc/uc20250204_february_4_2025.1738694905.txt.gz · Last modified: by nchanove

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki