* Seattle - nothing to report | * Seattle - nothing to report | ||
* Washington - nothing to report | * Washington - nothing to report | ||
- | * Wyoming - xxx | + | * Wyoming - nothing to report |
* BYU - nothing to report | * BYU - nothing to report | ||
* Colorado - nothing to report | * Colorado - nothing to report | ||
* JHU - nothing to report | * JHU - nothing to report | ||
- | * NMSU - confusion about password mailing | + | * NMSU - Moire has not been receiving the quarterly institutional passwords by postal mail - Bill will follow up |
* Oklahoma - nothing to report | * Oklahoma - nothing to report | ||
* Georgia State - nothing to report | * Georgia State - nothing to report | ||
Line 25: | Line 25: | ||
The detailed site report is included below, followed by additional information discussed during today' | The detailed site report is included below, followed by additional information discussed during today' | ||
- | // 3.5-m Telescope and Instruments Highlights, | + | // 3.5-m Telescope and Instruments Highlights, |
1) Overview | 1) Overview | ||
Line 61: | Line 61: | ||
=== Additional site, telescope and instrument discussion === | === Additional site, telescope and instrument discussion === | ||
- | Nothing to add other than what was in agenda. There is a multi-day weather system coming in tonight, which could include snow. The KOSMOS weirdness that Zach reported above has been resolved. There was an emergency vacuum | + | The site had a few power related issues recently. There was fuel contamination |
+ | |||
+ | During a recent routine, scheduled power outage, after coming back to main utility power a breaker | ||
+ | |||
+ | Both the 3.5m and 0.5m telescopes are working as expected. The cold weather in January led to some issues with some of the instruments (primarily with shutters). The KOSMOS slit viewer shutter was sticky when temperatures fell below its temperature rating. We replaced it with a spare and are looking to get more spares on hand. The disperser and mask wheels also were struggling in cold weather. The ARCTIC diffuser mechanism | ||
+ | |||
+ | Misty asked if we have discussed any long-term solutions to avoiding these instrument cold issues in light of the extreme weather we have been (and likely | ||
---- | ---- | ||
Line 67: | Line 73: | ||
=== 2025 Q1 3.5m scheduling === | === 2025 Q1 3.5m scheduling === | ||
- | We have some unassigned time in Q1 (mostly B halves). This time is listed as OPEN on the Q1 schedule. Users should look at the schedule and follow the usual channels for requesting this time (i.e. email Russet, Amanda, Ben, Nancy and their institutional scheduler when submitting requests, and provide a proposal cover page if you don't already have a program scheduled for the current quarter). | + | We have some unassigned time in Q1 (mostly B halves) |
---- | ---- | ||
- | === 2025 Q1 0.5 scheduling === | + | === 2025 Q2 3.5m scheduling === |
- | The 2025 Q1 ARCSAT scheduled is posted. We only had 2 requests this quarter (note added in proof: we received a third request, so there are now 3 programs scheduled | + | The allocations were sent to all institutions yesterday; proposals are due on February 24. A few items to note: (1) any users who request to use Agile in Q2 should specify a backup instrument, (2) DIS is offered |
---- | ---- | ||
- | === Website Modernization Effort | + | === 2025 Q1 0.5 scheduling |
+ | |||
+ | The 2025 Q1 ARCSAT scheduled is posted. There is available time that people can request in the next week and a half, and then again in the last week of March. In early March we will have an onsite class and other stuff going on so ARCSAT is not available during weeks when the schedule is marked BUSY. | ||
- | There is a plan to run a test tomorrow for converting the site to new servers (but this may be postponed due to illness). | ||
---- | ---- | ||
+ | |||
=== IT Security === | === IT Security === | ||
- | The IT team at APO is still researching applications | + | No new announcements. We are trying |
---- | ---- | ||
Line 92: | Line 100: | ||
=== Status of new instrument initiatives === | === Status of new instrument initiatives === | ||
- | We have heard no news from NSF regarding the pre-proposal that was submitted for ASPEN; we hope to hear soon. Sarah reported that since having received the Ocotillo CDR report on December 2 her team has been evaluating the comments and preparing a response. They also applied for some funding and are waiting | + | We still have heard no news from NSF regarding the pre-proposal that was submitted for ASPEN. |
---- | ---- | ||
Line 98: | Line 106: | ||
=== DIS Decommissioning Plans === | === DIS Decommissioning Plans === | ||
- | Nancy is working on developing a document | + | Nancy has drafted an instrument decommissioning document that she and Bill are working on. The hope is to have this general |
---- | ---- | ||
Line 106: | Line 114: | ||
Open action items from previous meetings: | Open action items from previous meetings: | ||
- | * Nancy: get ROM costs for new KOSMOS grisms. | + | * Nancy: get Mt. Cuba Foundation proposal |
* Nancy: Ensure that a short description of the impact of satellites be posted on the APO website somewhere and updated every 6 months or so. Nancy received examples of this issue from Anne Verbiscer and will get something added to the current (and new) web site. STATUS: OPEN. | * Nancy: Ensure that a short description of the impact of satellites be posted on the APO website somewhere and updated every 6 months or so. Nancy received examples of this issue from Anne Verbiscer and will get something added to the current (and new) web site. STATUS: OPEN. | ||
* UC reps: remind your users to review the Q1 schedule and request OPEN/DD time if they can make a good case for it. STATUS: OPEN. | * UC reps: remind your users to review the Q1 schedule and request OPEN/DD time if they can make a good case for it. STATUS: OPEN. | ||
Line 118: | Line 126: | ||
=== All Other Business === | === All Other Business === | ||
- | None | + | There was a question about the development of Ocotillo (and other instruments) and whether it is contingent on getting federal funds (e.g. from NSF). This led to the question of how reliant APO is (more broadly) on federal funds. These items were discussed in light of the recent chaos resulting from the suspension of federal grant payments until they can be confirmed to be compliant with the recent Executive Orders. |
---- | ---- | ||
Line 124: | Line 132: | ||
=== Next meeting === | === Next meeting === | ||
- | The next meeting will be on February | + | The next meeting will be on March 4, 2025 at 10:30 MST. |
---- | ---- | ||