This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20250107_january_7_2025 [2025/01/24 19:59] nchanove |
uc:uc20250107_january_7_2025 [2025/01/24 20:04] (current) nchanove |
||
---|---|---|---|
Line 69: | Line 69: | ||
=== 2025 Q1 0.5 scheduling === | === 2025 Q1 0.5 scheduling === | ||
- | The 2025 Q1 ARCSAT scheduled is posted. We only had 2 requests this quarter (note added in proof: we received a third request, so there are now 3 programs scheduled to use ARCSAT in Q1. We are continuing to struggle with frequent failures in communication with the camera (which manifests as a " | + | The 2025 Q1 ARCSAT scheduled is posted. We only had 2 requests this quarter (note added in proof: we received a third request, so there are now 3 programs scheduled to use ARCSAT in Q1). We are continuing to struggle with frequent failures in communication with the camera (which manifests as a " |
---- | ---- | ||
Line 88: | Line 88: | ||
=== Status of new instrument initiatives === | === Status of new instrument initiatives === | ||
- | We have heard no news from NSF regarding the pre-proposal that was submitted for ASPEN; we hope to hear soon. Sarah reported that since having received the Ocotillo CDR report on December 2 her team has been evaluating the comments and preparing a response. They also applied for some funding and are waiting to hear back. It is clear that the instrument will come together in a phased approach, bringing the three channels | + | We have heard no news from NSF regarding the pre-proposal that was submitted for ASPEN; we hope to hear soon. Sarah reported that since having received the Ocotillo CDR report on December 2 her team has been evaluating the comments and preparing a response. They also applied for some funding and are waiting to hear back. It is clear that the instrument will come together in a phased approach, bringing the three channels |
---- | ---- |