uc:uc20250107_january_7_2025

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
uc:uc20250107_january_7_2025 [2025/01/07 18:15]
nchanove
uc:uc20250107_january_7_2025 [2025/01/24 20:04] (current)
nchanove
Line 3: Line 3:
 ---- ----
  
-Attending: Nancy Chanover (NMSU), Jamey Eriksen (APO), Aleksandr Mosenkov (BYU), Bill Ketzeback (APO), Eric Bellm (UW), Anne Verbiscer (UVa), Moire Prescott (NMSU), Moire Prescott (NMSU), Russet McMillan (APO), Misty Bentz (GSU),  Kevin Schlaufman (JHU), Zach BT (CU), Sarah Tuttle (UW),  Joanne Hughes (Seattle U), Ben Williams (UW), Chip (UWy)+Attending: Nancy Chanover (NMSU), Jamey Eriksen (APO), Aleksandr Mosenkov (BYU), Bill Ketzeback (APO), Eric Bellm (UW), Anne Verbiscer (UVa), Moire Prescott (NMSU), Moire Prescott (NMSU), Russet McMillan (APO), Misty Bentz (GSU),  Kevin Schlaufman (JHU), Zach Berta-Thompson (CU), Sarah Tuttle (UW),  Joanne Hughes (Seattle U), Ben Williams (UW), Chip Kobulnicky (UWy)
  
 === User feedback and comments from institutional representatives === === User feedback and comments from institutional representatives ===
Line 13: Line 13:
   * Washington - nothing to report   * Washington - nothing to report
   * Georgia State - nothing to report   * Georgia State - nothing to report
-  * Colorado - Katrina Murray - ARCTIC diffuser rotator stopped working; ZBT had weird issues with KOSMOS as stopped taking exposures+  * Colorado - the ARCTIC diffuser rotator stopped working and users are asking about the timeline for getting it repairedone user had weird issue with KOSMOS when it stopped taking exposures
   * Wyoming - nothing to report   * Wyoming - nothing to report
   * UVa - nothing to report   * UVa - nothing to report
Line 57: Line 57:
 === Additional site, telescope and instrument discussion ===  === Additional site, telescope and instrument discussion === 
  
-Nothing to add other than what was in agenda. Multi-day storm coming tonight, could include snow. KOSMOS weirdness that Zach reported has been resolved. Emergency vacuum service for ARCTIC. Ion pump was replaced this past weekenddiffuser rotator scheduled to be fixed. Agile still at repair shop. ARCES is back and usable after weirdness with daytime metrology data. ARCTIC used B half last night without issue. Russet: remove rotation restriction for ARCTIC. Check with Amanda about headers not being written for KOSMOS a few weeks ago ZBT had issues. Diffuser - tensioned but rotation sensor is not working properly.+Nothing to add other than what was in agenda. There is a multi-day weather system coming in tonight, which could include snow. The KOSMOS weirdness that Zach reported above has been resolved. There was an emergency vacuum servicing done for ARCTIC; the ion pump was replaced this past weekend. ARCTIC was used B half last night without issue. Russet suggested that we remove the rotation restriction for ARCTIC. The diffuser rotator repair is still to be scheduled; it was tensioned but the rotation sensor is not working properly. Agile is still at the repair shop. ARCES is back and usable after the issue with daytime metrology data described in the site report above. Russet will check with Amanda about headers not being written properly for KOSMOS; this anomaly affected Zach BT a few weeks ago. 
  
 ---- ----
Line 63: Line 63:
 === 2025 Q1 3.5m scheduling === === 2025 Q1 3.5m scheduling ===
  
-We have some unassigned time in Q1 next week (Jan 09B - offered to specific ppl but need to cast net broadly, but also forecast is quite poor, want someone if weather improves but might claim for engineering). Most are B halves as well as in Feb (8 is next one). Time is listed as OPEN. Users should look at the schedule and follow the usual channels for requesting this time (i.e. email Russet, Amanda, Ben, Nancy and their institutional scheduler when submitting requests, and provide a proposal cover page if you don't already have a program scheduled for the current quarter). Users can request time listed as OPEN or DD.+We have some unassigned time in Q1 (mostly B halves). This time is listed as OPEN on the Q1 schedule. Users should look at the schedule and follow the usual channels for requesting this time (i.e. email Russet, Amanda, Ben, Nancy and their institutional scheduler when submitting requests, and provide a proposal cover page if you don't already have a program scheduled for the current quarter).
  
 ---- ----
Line 69: Line 69:
 === 2025 Q1 0.5 scheduling === === 2025 Q1 0.5 scheduling ===
  
-The 2025 Q1 ARCSAT scheduled is posted. Only had 2 requests this quarter. Continuing to struggle with frequent failure in communication with camera ("support library error"- camera is getting old. Temporary fix is fairly quick so if observers can keep an eye on it and report errors it can be recovered pretty quickly. Early March onsite class and other stuff going on so not available for ARCSAT.+The 2025 Q1 ARCSAT scheduled is posted. We only had 2 requests this quarter (note added in proof: we received a third request, so there are now 3 programs scheduled to use ARCSAT in Q1)We are continuing to struggle with frequent failures in communication with the camera (which manifests as a "support library error"); FlareCam is getting old. The temporary fix is fairly quick so if observers can keep an eye on it and report errors it can be recovered pretty quickly. In early March we will have an onsite class and other stuff going on so ARCSAT is not available during weeks when the schedule is marked BUSY.
  
 ---- ----
Line 75: Line 75:
 === Website Modernization Effort === === Website Modernization Effort ===
  
-Test tomorrow on converting site to new servers - just heard from Shane that may be rescheduled due to illness.+There is a plan to run a test tomorrow for converting the site to new servers (but this may be postponed due to illness).
  
 ---- ----
Line 81: Line 81:
 === IT Security === === IT Security ===
  
-Still researching applications to improve password handling but it'coming.+The IT team at APO is still researching applications to improve password handling; all we know right now is that the switching of the TUI password is coming.
  
 ---- ----
Line 88: Line 88:
 === Status of new instrument initiatives ===  === Status of new instrument initiatives === 
  
-No news on ASPEN pre-proposal from NSF. Hope to hear soon. +We have heard no news from NSF regarding the pre-proposal that was submitted for ASPEN; we hope to hear soon. Sarah reported that since having received the Ocotillo CDR report on December 2 her team has been evaluating the comments and preparing a responseThey also applied for some funding and are waiting to hear backIt is clear that the instrument will come together in phased approach, bringing the three channels online one at a time. They will start with the IFU and follow up with MOS component, which is more costly and mechanically complicated. The hope is that this would enable supported data reduction development along the way and troubleshooting as we go. It also spaces out the cost, which reduces impact on the overall observatory budget. Their goal is to have their response report back to the CDR review panel by the end of the month.
-Ocotillo CDR - evaluate subsequent report. Also applying for funding. Will come together in phased approach, bring channels on line one at a time. Start with IFUfollow up with MOS component more costly and mechanically complicated. Hoping that this would enable supported data reduction developmenttroubleshooting as we go. Spaces out the cost, reduces impact on budget. End of month have report back to CDR review panel.+
  
 ---- ----
Line 95: Line 94:
 === DIS Decommissioning Plans === === DIS Decommissioning Plans ===
  
-In the works.+Nancy is working on developing a document that lays out the decommissioning plan for DIS. The instrument has not been serviced and will only be available in Q1 (and Q2) in a shared risk mode.
  
 ---- ----
Line 103: Line 102:
  
 Open action items from previous meetings: Open action items from previous meetings:
-  * Nancy: get ROM costs for new KOSMOS grisms. Sarah reported that she has a finalized quote from one vendor. The grism design turns out to be a little complicated, but also, costs have gone up, so these are more expensive than we expected (ballpark $20k apiece). Therefore, we need to explore potential funding sources. We have reached an impasse in terms of prioritizing the desired grism; Nancy will amass all previous emails with grism requests and send to UC reps to query users about whether there is broad interest in a particular grism. This could help identify funding sources, either individually or collaboratively. STATUS: OPEN.+  * Nancy: get ROM costs for new KOSMOS grisms. Sarah reported that she has a finalized quote from one vendor. The grism design turns out to be a little complicated, but also, costs have gone up, so these are more expensive than we expected (ballpark $20k apiece). Therefore, we need to explore potential funding sources. We have reached an impasse in terms of prioritizing the desired grism; Nancy will amass all previous emails with grism requests and send to UC reps to query users about whether there is broad interest in a particular grism. This could help identify funding sources, either individually or collaboratively. STATUS: OPEN. Nancy has started a proposal to the Mt. Cuba Foundation for several grisms and hopes to have it submitted before the next Users Committee meeting.
   * Nancy: Ensure that a short description of the impact of satellites be posted on the APO website somewhere and updated every 6 months or so. Nancy received examples of this issue from Anne Verbiscer and will get something added to the current (and new) web site. STATUS: OPEN.   * Nancy: Ensure that a short description of the impact of satellites be posted on the APO website somewhere and updated every 6 months or so. Nancy received examples of this issue from Anne Verbiscer and will get something added to the current (and new) web site. STATUS: OPEN.
-  * UC reps: remind your users to review the Q4 and Q1 schedules and request OPEN/DD time if they can make a good case for it. STATUS: OPEN+  * UC reps: remind your users to review the Q1 schedule and request OPEN/DD time if they can make a good case for it. STATUS: OPEN.
-  * UC reps: remind your users that they can propose to use Agile in Q1 2025 (but must include a backup instrument). STATUS: CLOSED.+
  
 Open action items from this meeting:  Open action items from this meeting: 
  
-  * UC reps: poll your Agile users concerning whether or not they adjust the camera gain setting - there are 3 selectable gains - software electability is what has changed and can't get it to work. From last feedback with repair facility that can still be adjusted manually. That IS working. If they are unable to make further progress on software changes we will get camera back and gain can be sleeted at beginning of run by observing specialist. Will likely have to remeasure those gains because the main readout board was changed out during previous camera repair. Previous choices were ~ 1, 2, 4 e/DN. +  * None.
- +
-  * UC reps: alert your users to the fact that plans are being formulated for decommissioning DIS (see below).+
  
 ---- ----
Line 118: Line 114:
 === All Other Business === === All Other Business ===
  
-xxx+None
  
 ---- ----