This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20250107_january_7_2025 [2025/01/05 16:15] nchanove |
uc:uc20250107_january_7_2025 [2025/01/24 20:04] (current) nchanove |
||
---|---|---|---|
Line 3: | Line 3: | ||
---- | ---- | ||
- | Attending: UPDATE ALL: Nancy Chanover (NMSU), | + | Attending: Nancy Chanover (NMSU), |
=== User feedback and comments from institutional representatives === | === User feedback and comments from institutional representatives === | ||
- | * Oklahoma - nothing to report | + | * Oklahoma - no report |
* BYU - nothing to report | * BYU - nothing to report | ||
* JHU - nothing to report | * JHU - nothing to report | ||
Line 14: | Line 13: | ||
* Washington - nothing to report | * Washington - nothing to report | ||
* Georgia State - nothing to report | * Georgia State - nothing to report | ||
- | * Colorado - nothing to report | + | * Colorado - the ARCTIC diffuser rotator stopped working and users are asking about the timeline for getting it repaired; one user had a weird issue with KOSMOS when it stopped taking exposures |
* Wyoming - nothing to report | * Wyoming - nothing to report | ||
* UVa - nothing to report | * UVa - nothing to report | ||
* Seattle - nothing to report | * Seattle - nothing to report | ||
- | * NAPG - nothing to report | + | * NAPG - no report |
---- | ---- | ||
Line 30: | Line 29: | ||
1) Overview | 1) Overview | ||
- | Weather wise, December | + | Weather wise, December |
2) Operations | 2) Operations | ||
Line 58: | Line 57: | ||
=== Additional site, telescope and instrument discussion === | === Additional site, telescope and instrument discussion === | ||
- | xxx | + | Nothing to add other than what was in agenda. There is a multi-day weather system coming in tonight, which could include snow. The KOSMOS weirdness that Zach reported above has been resolved. There was an emergency vacuum servicing done for ARCTIC; the ion pump was replaced this past weekend. ARCTIC was used B half last night without issue. Russet suggested that we remove the rotation restriction for ARCTIC. The diffuser rotator repair is still to be scheduled; it was tensioned but the rotation sensor is not working properly. Agile is still at the repair shop. ARCES is back and usable after the issue with daytime metrology data described in the site report above. Russet will check with Amanda about headers not being written properly for KOSMOS; this anomaly affected Zach BT a few weeks ago. |
---- | ---- | ||
Line 64: | Line 63: | ||
=== 2025 Q1 3.5m scheduling === | === 2025 Q1 3.5m scheduling === | ||
- | We have some unassigned time in Q1 next week (xxx) as well as in Feb (xxx). Users should look at the schedule and follow the usual channels for requesting this time (i.e. email Russet, Amanda, Ben, Nancy and their institutional scheduler when submitting requests, and provide a proposal cover page if you don't already have a program scheduled for the current quarter). Users can request time listed as OPEN or DD. | + | We have some unassigned time in Q1 (mostly B halves). This time is listed |
---- | ---- | ||
Line 70: | Line 69: | ||
=== 2025 Q1 0.5 scheduling === | === 2025 Q1 0.5 scheduling === | ||
- | The 2025 Q1 ARCSAT scheduled is posted. | + | The 2025 Q1 ARCSAT scheduled is posted. |
---- | ---- | ||
Line 76: | Line 75: | ||
=== Website Modernization Effort === | === Website Modernization Effort === | ||
- | xxx | + | There is a plan to run a test tomorrow for converting the site to new servers (but this may be postponed due to illness). |
---- | ---- | ||
Line 82: | Line 81: | ||
=== IT Security === | === IT Security === | ||
- | xxx | + | The IT team at APO is still researching applications to improve password handling; all we know right now is that the switching of the TUI password is coming. |
---- | ---- | ||
Line 89: | Line 88: | ||
=== Status of new instrument initiatives === | === Status of new instrument initiatives === | ||
- | xxxx UPDATE xxxx Nancy provided some updates on instrumentation. Ocotillo | + | We have heard no news from NSF regarding the pre-proposal that was submitted for ASPEN; we hope to hear soon. Sarah reported that since having received the Ocotillo |
---- | ---- | ||
Line 95: | Line 94: | ||
=== DIS Decommissioning Plans === | === DIS Decommissioning Plans === | ||
- | xxx | + | Nancy is working on developing a document that lays out the decommissioning plan for DIS. The instrument has not been serviced and will only be available in Q1 (and Q2) in a shared risk mode. |
---- | ---- | ||
Line 103: | Line 102: | ||
Open action items from previous meetings: | Open action items from previous meetings: | ||
- | * Nancy: get ROM costs for new KOSMOS grisms. Sarah reported that she has a finalized quote from one vendor. The grism design turns out to be a little complicated, | + | * Nancy: get ROM costs for new KOSMOS grisms. Sarah reported that she has a finalized quote from one vendor. The grism design turns out to be a little complicated, |
* Nancy: Ensure that a short description of the impact of satellites be posted on the APO website somewhere and updated every 6 months or so. Nancy received examples of this issue from Anne Verbiscer and will get something added to the current (and new) web site. STATUS: OPEN. | * Nancy: Ensure that a short description of the impact of satellites be posted on the APO website somewhere and updated every 6 months or so. Nancy received examples of this issue from Anne Verbiscer and will get something added to the current (and new) web site. STATUS: OPEN. | ||
- | * UC reps: remind your users to review the Q4 and Q1 schedules | + | * UC reps: remind your users to review the Q1 schedule |
- | * UC reps: remind your users that they can propose to use Agile in Q1 2025 (but must include a backup instrument). STATUS: CLOSED. | + | |
Open action items from this meeting: | Open action items from this meeting: | ||
- | * UC reps: poll your Agile users concerning whether or not they adjust the camera gain setting | + | * None. |
- | * UC reps: alert your users to the fact that plans are being formulated for decommissioning DIS (see below). | + | |
---- | ---- | ||
Line 117: | Line 114: | ||
=== All Other Business === | === All Other Business === | ||
- | xxx | + | None |
---- | ---- |