This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20241203_december_3_2024 [2024/12/03 18:25] nchanove |
uc:uc20241203_december_3_2024 [2024/12/20 22:54] (current) nchanove |
||
---|---|---|---|
Line 11: | Line 11: | ||
* BYU - nothing to report | * BYU - nothing to report | ||
* Washington - nothing to report | * Washington - nothing to report | ||
- | * Colorado - no report | + | * Colorado - users requested updates on Ocotillo, new echelle, and any other instrument initiatives; |
* UVa - nothing to report | * UVa - nothing to report | ||
* FGCU - no report | * FGCU - no report | ||
Line 18: | Line 18: | ||
* Oklahoma - nothing to report | * Oklahoma - nothing to report | ||
* JHU - nothing to report | * JHU - nothing to report | ||
- | * NMSU - note from Joe B - funds from KOSMOS masks- reminder we need to spend (Deadline of 12/16 to submit order) | + | * NMSU - Moire reminded us that Joe Burchett still has some remaining |
* NAPG - no report | * NAPG - no report | ||
Line 61: | Line 61: | ||
=== Additional site, telescope and instrument discussion === | === Additional site, telescope and instrument discussion === | ||
- | November 11-12 for ARCTIC emergency vacuum service. Echelle | + | There was an emergency vacuum service performed on ARCTIC during |
---- | ---- | ||
Line 67: | Line 67: | ||
=== 2024 Q4 3.5m scheduling === | === 2024 Q4 3.5m scheduling === | ||
- | We have some unassigned time in Q4 (5 B-half dates in late December, | + | We have some unassigned time in Q4 (5 B-half dates in late December, |
---- | ---- | ||
Line 73: | Line 73: | ||
=== 2025 Q1 3.5m scheduling === | === 2025 Q1 3.5m scheduling === | ||
- | Schedule | + | The Q1 2025 schedule is being worked on as we speak. |
---- | ---- | ||
Line 79: | Line 79: | ||
=== 2024 Q4 0.5 scheduling === | === 2024 Q4 0.5 scheduling === | ||
- | The Q4 ARCSAT scheduled is posted. There is time available in the last week of December (but with no requests for filter changes). | + | The Q4 ARCSAT scheduled is posted. There is time available in the last week of December (but with no requests for filter changes). The Q1 2025 call for proposals will be issued once the Q1 schedule for the 3.5m is posted. |
---- | ---- | ||
Line 85: | Line 85: | ||
=== Website Modernization Effort === | === Website Modernization Effort === | ||
- | Parallel | + | We are now planning to move forward with two parallel |
---- | ---- | ||
Line 91: | Line 91: | ||
=== IT Security === | === IT Security === | ||
+ | We are increasingly concerned about potential IT security threats to our system. One possible change that will be made in the coming months is to change (and more regularly update) the TUI password. We will continue to provide details to our users as these plans develop. | ||
---- | ---- | ||
Line 97: | Line 97: | ||
=== Recent ARC BoG Meeting === | === Recent ARC BoG Meeting === | ||
- | xxx | + | Nancy presented a summary of the 3.5m-related activities for 2024 (including science highlights from each ARC member institution) at the ARC Board of Governors meeting on Friday November 8, 2024. The Board was positive about our reports and approved our budget request for 2025. |
---- | ---- | ||
Line 103: | Line 103: | ||
=== Status of new instrument initiatives === | === Status of new instrument initiatives === | ||
+ | Nancy provided some updates on instrumentation. Ocotillo underwent a Critical Design Review in mid-October and the review panel is working on finalizing their report to deliver back to the instrument team. Work is continuing on the new echelle spectrograph (now called ASPEN, short for ARC Spectrograph for Echelle iNvestigations) and some funding requests have been submitted. We will continue to update this group on a regular basis concerning both initiatives. | ||
---- | ---- | ||
Line 112: | Line 112: | ||
* Nancy: get ROM costs for new KOSMOS grisms. Sarah reported that she has a finalized quote from one vendor. The grism design turns out to be a little complicated, | * Nancy: get ROM costs for new KOSMOS grisms. Sarah reported that she has a finalized quote from one vendor. The grism design turns out to be a little complicated, | ||
* Nancy: Ensure that a short description of the impact of satellites be posted on the APO website somewhere and updated every 6 months or so. Nancy received examples of this issue from Anne Verbiscer and will get something added to the current (and new) web site. STATUS: OPEN. | * Nancy: Ensure that a short description of the impact of satellites be posted on the APO website somewhere and updated every 6 months or so. Nancy received examples of this issue from Anne Verbiscer and will get something added to the current (and new) web site. STATUS: OPEN. | ||
- | * UC reps: remind your users to review the Q4 schedule | + | * UC reps: remind your users to review the Q4 and Q1 schedules |
- | * UC reps: remind your users that they can propose to use Agile in Q1 2025 (but must include a backup instrument). | + | * UC reps: remind your users that they can propose to use Agile in Q1 2025 (but must include a backup instrument). |
- | * UC reps: alert your users to the fact that plans are being formulated for decommissioning DIS. | + | |
Open action items from this meeting: | Open action items from this meeting: | ||
- | xxxxxx | + | * UC reps: poll your Agile users concerning whether or not they adjust the camera gain setting |
+ | * UC reps: alert your users to the fact that plans are being formulated for decommissioning DIS (see below). | ||
---- | ---- | ||
Line 124: | Line 124: | ||
=== All Other Business === | === All Other Business === | ||
- | None. | + | Nancy raised the topic of decommissioning DIS. It is no longer performing in an optimal fashion and was not serviced in Q4 due to the fact that there was no demand for the instrument. Notably, 2024 was the first year that KOSMOS was the most frequently used instrument on the 3.5m, with ARCES as the second-most requested instrument. Nancy and Bill are developing a decommissioning plan and will provide more updates in Q1 2025. Meanwhile, UC reps: please alert your users to our plans for DIS and let us know if there is any feedback from the users. |
---- | ---- | ||
Line 130: | Line 130: | ||
=== Next meeting === | === Next meeting === | ||
- | The next meeting will be on January 7, 2025 at 10:30 MST. (??) | + | The next meeting will be on January 7, 2025 at 10:30 MST. |
---- | ---- | ||