This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20240604_june_4_2024 [2024/06/04 19:29] nchanove |
uc:uc20240604_june_4_2024 [2024/06/04 19:36] (current) nchanove |
||
---|---|---|---|
Line 57: | Line 57: | ||
=== Additional site, telescope and instrument discussion === | === Additional site, telescope and instrument discussion === | ||
- | The weather improved during May (although thunderstorms are in the forecast for later this week!). Dust and wind have been the main weather issues of late. Despite the seasonal increase in temperature the telescope is performing well. The DSSI guest instrument team was on site in May, but no class groups. The fire near Timberon that was reported on last month has been put out/ | + | The weather improved during May (although thunderstorms are in the forecast for later this week!). Dust and wind have been the main weather issues of late. Despite the seasonal increase in temperature the telescope is performing well. The DSSI guest instrument team was on site in May, but no class groups. The fire near Timberon that was reported on last month has been put out/ |
Joanne has been in touch with Bill about the turnaround time for new slit masks for KOSMOS; the bare minimum is 2 weeks but ideally people should allow longer. She may ask for some more masks to be made this week in preparation of her summer observing runs (on June 28 and in Q3). | Joanne has been in touch with Bill about the turnaround time for new slit masks for KOSMOS; the bare minimum is 2 weeks but ideally people should allow longer. She may ask for some more masks to be made this week in preparation of her summer observing runs (on June 28 and in Q3). | ||
Line 71: | Line 71: | ||
=== 2024 Q3 3.5m scheduling === | === 2024 Q3 3.5m scheduling === | ||
- | Amanda is working on the draft schedule; we hope to have it done by the end of this week or early next week. | + | Amanda is working on the Q3 schedule; we hope to have it finalized and published |
---- | ---- | ||
Line 77: | Line 77: | ||
=== 2024 Q2 0.5 scheduling === | === 2024 Q2 0.5 scheduling === | ||
- | All of the Q2 time on ARCSAT is spoken for (the last week of June is reserved for engineering). The call for Q3 requests will go out after the 3.5m schedule is published, and proposals will likely be due in the last week of June (with the Q3 schedule starting in early July). The shutdown dates for ARCSAT will be same as for the 3.5m, i.e. August 12-26. | + | All of the Q2 time on ARCSAT is spoken for (the last week of June is reserved for engineering). The call for Q3 requests will go out after the 3.5m Q3 schedule is published, and proposals will likely be due in the last week of June (with the Q3 schedule starting in early July). The shutdown dates for ARCSAT will be same as for the 3.5m, i.e. August 12-26. |
---- | ---- | ||
Line 89: | Line 89: | ||
=== Website Modernization Effort === | === Website Modernization Effort === | ||
- | A lot of work has been done behind the scenes to develop a new APO web site. Shane Thomas has created a whole separate web site with a more modern front end and database-driven apps on the back end. It has been time consuming to port all of the existing web site content over, which was the first step, and recently we have been evaluating how to improve the user experience and remove redundant or unnecessary information. We are now at the point of being ready to solicit feedback on the content of the new web site. All users are encouraged to review | + | A lot of work has been done behind the scenes to develop a new APO web site. Shane Thomas has created a whole separate web site with a more modern front end and database-driven apps on the back end. It has been time consuming to port all of the existing web site content over, which was the first step, and recently we have been evaluating how to improve the user experience and remove redundant or unnecessary information. We are now at the point of being ready to solicit feedback on the content of the new web site. All users are encouraged to review the new web site and confirm that the information you frequently wish to access is there and easily findable for you. We are not seeking comments on the look-and-feel or style (yet). The current version is considered to be in the "alpha state" so it is still fairly preliminary. Once we receive and address the first round of feedback then we will go to a beta version and then deploy it, likely in a tiered fashion. The new web site is going to be mobile friendly, though it may not work well on all pages yet. **UC reps: ask your users to review the new web site (https:// |
The deadline for providing feedback on the alpha version of the new web site is Tuesday July 2 at 10:00 am MDT.** | The deadline for providing feedback on the alpha version of the new web site is Tuesday July 2 at 10:00 am MDT.** | ||
Line 98: | Line 98: | ||
Open action items from previous meetings: | Open action items from previous meetings: | ||
- | * Nancy: get ROM costs for new KOSMOS grisms. Sarah Tuttle provided an update on this at today' | + | * Nancy: get ROM costs for new KOSMOS grisms. Sarah Tuttle provided an update on this at today' |
* UC reps: remind your users to review the Q2 schedule and request OPEN/DD time if they can make a good case for it. STATUS: OPEN. | * UC reps: remind your users to review the Q2 schedule and request OPEN/DD time if they can make a good case for it. STATUS: OPEN. | ||
* UC reps: remind your users to send Nancy references for all 3.5m- and 0.5m-related publications from Jan. 1 2023 to present by the deadline of June 30. STATUS: OPEN. | * UC reps: remind your users to send Nancy references for all 3.5m- and 0.5m-related publications from Jan. 1 2023 to present by the deadline of June 30. STATUS: OPEN. |