User Tools

Site Tools


uc:uc20240604_june_4_2024

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
uc:uc20240604_june_4_2024 [2024/06/04 16:38]
nchanove
uc:uc20240604_june_4_2024 [2024/06/04 19:36] (current)
nchanove
Line 3: Line 3:
 ---- ----
  
-Attending: Nancy Chanover (NMSU), Joanne Hughes (Seattle U), Aleksandr Mosenkov (BYU), Bill Ketzeback (APO), Jamey Eriksen (APO), Yuta Notsu (CU), Eric Nielsen (NMSU), Anne Verbiscer (UVa), Kevin Schlaufman (JHU), Sarah Tuttle (UW), Mukremin Kilic (OU), Eric Bellm (UW), Shane Thomas, Chip Kobulnicky (UWy), Misty Bentz (GSU), Ben Williams (UW), Gordon MacDonald (APO)+Attending: Nancy Chanover (NMSU), Joanne Hughes (Seattle U), Aleksandr Mosenkov (BYU), Bill Ketzeback (APO), Jamey Eriksen (APO), Yuta Notsu (CU), Eric Nielsen (NMSU), Anne Verbiscer (UVa), Kevin Schlaufman (JHU), Sarah Tuttle (UW), Mukremin Kilic (OU), Eric Bellm (UW), Shane Thomas (APO), Chip Kobulnicky (UWy), Misty Bentz (GSU), Ben Williams (UW), Gordon MacDonald (APO)
  
  
Line 19: Line 19:
   * NAPG - no report   * NAPG - no report
   * FGCU - no report   * FGCU - no report
-  * Seattle - nothing to report -want to talk about grismsmasks+  * Seattle - nothing to report other than Joanne would like to discuss KOSMOS grisms and slit masks (covered in more detail below)
  
 ---- ----
Line 55: Line 55:
 ---- ----
  
-=== Additional telescope and instrument discussion === +=== Additional site, telescope and instrument discussion === 
  
-May had improving weather (but storms forecasted for later this week). Dust and winds have been issueTempincrease handled fine. DSSI visit in May. Fire near Timberon put out/contained. Fire near Cloudcroft handled. Biggest one is Ruidiso -7500 acres -> 8000 acres. Containment ~ 50% huge smoke plume but going away from usOther happenings - hosting science talks encourage visiting scientists to give them when come to site (visitors, NMSU ppl)Cool tour group from Air Force reliability labCool northern lights viewing last month from all sky camera.+The weather improved during May (although thunderstorms are in the forecast for later this week!). Dust and wind have been the main weather issues of lateDespite the seasonal increase in temperature the telescope is performing wellThe DSSI guest instrument team was on site in May, but no class groupsThe fire near Timberon that was reported on last month has been put out/contained. A subsequent fire near Cloudcroft broke out but was handled quicklyThe biggest fire we are currently watching is in Ruidoso; it has increased in size to about 8000 acres and is at the ~50% containment level. There is a huge smoke plume associated with this fire but currently it is moving in a direction away from APOAs for other site happenings, Jamey has continued to offer science talks given by visiting astronomers for the day staff; this helps them understand what the 3.5m telescope is being used for and allows the staff to put a face with a name. We encourage visiting scientists to give science talk when coming to site so please consider this when you plan your next trip to APOWe gave a tour to a group from the Air Force Reliability LabAlso, the site had some spectacular views of the northern lights last month with the all-sky camera. As for operations updates, the telescope is working well. The new 1.25" slits arrived from UW and engineering tests revealed that their performance is good. The ARCTIC diffuser rotation mechanism is fixed. **UC reps: please notify your ARCTIC users that the diffuser rotation capability is available once again.** Agile is currently being investigated by Cary and Bill and we expect to have an update next month if not sooner. Everything else is behaving as expected. 
 + 
 +Joanne has been in touch with Bill about the turnaround time for new slit masks for KOSMOS; the bare minimum is 2 weeks but ideally people should allow longer. She may ask for some more masks to be made this week in preparation of her summer observing runs (on June 28 and in Q3).
  
 ---- ----
Line 63: Line 65:
 === 2024 Q2 3.5m scheduling === === 2024 Q2 3.5m scheduling ===
  
-We have a some unassigned time (OPEN or DD01) remaining in Q2, specifically June 13A, June 15B, 16B, 18B and 23B. Some of the available slots are short, while others are complete half-nights. Users should follow the usual channels for requesting any of this time (i.e. email Russet, Amanda, Ben, Nancy and their institutional scheduler when submitting requests, and provide a proposal cover page if you don't already have a program scheduled for the current quarter).+We have a some unassigned OPEN time remaining in Q2, specifically June 13A, June 15B, 16B, 18B and 23B. Some of the available slots are short, while others are complete half-nights. Users should follow the usual channels for requesting any of this time (i.e. email Russet, Amanda, Ben, Nancy and their institutional scheduler when submitting requests, and provide a proposal cover page if you don't already have a program scheduled for the current quarter).
  
 ---- ----
Line 69: Line 71:
 === 2024 Q3 3.5m scheduling === === 2024 Q3 3.5m scheduling ===
  
-xxx+Amanda is working on the Q3 schedule; we hope to have it finalized and published by the end of this week or early next week.
  
 ---- ----
Line 75: Line 77:
 === 2024 Q2 0.5 scheduling === === 2024 Q2 0.5 scheduling ===
  
-xxx+All of the Q2 time on ARCSAT is spoken for (the last week of June is reserved for engineering). The call for Q3 requests will go out after the 3.5m Q3 schedule is published, and proposals will likely be due in the last week of June (with the Q3 schedule starting in early July). The shutdown dates for ARCSAT will be same as for the 3.5m, i.e. August 12-26.
  
 ---- ----
Line 87: Line 89:
 === Website Modernization Effort === === Website Modernization Effort ===
  
-Ben Williams provided an update regarding work being done to develop a new APO web site. Shane has created a whole separate web site with a more modern front end and database-driven apps on the back end. It has been time consuming to port all of the existing web site content over, which was the first step, and then evaluating how to improve the user experience and remove redundant or unnecessary information. We are getting close to the point where we will be ready to seek broader feedback on the new web site from the user community; we are aiming to provide the link to new site at the next Users Committee meeting so people can check it out and provide feedback.+A lot of work has been done behind the scenes to develop a new APO web site. Shane Thomas has created a whole separate web site with a more modern front end and database-driven apps on the back end. It has been time consuming to port all of the existing web site content over, which was the first step, and recently we have been evaluating how to improve the user experience and remove redundant or unnecessary information. We are now at the point of being ready to solicit feedback on the content of the new web site. All users are encouraged to review the new web site and confirm that the information you frequently wish to access is there and easily findable for you. We are not seeking comments on the look-and-feel or style (yet). The current version is considered to be in the "alpha state" so it is still fairly preliminary. Once we receive and address the first round of feedback then we will go to a beta version and then deploy it, likely in a tiered fashion. The new web site is going to be mobile friendly, though it may not work well on all pages yet. **UC reps: ask your users to review the new web site (https://newapo.apo.nmsu.edu/and provide any feedback on this spreadsheet: https://docs.google.com/spreadsheets/d/1XTGF1ekWatAW-T2xl71rIZgVlEBhtLVWJrkX8cSh8Nw/edit?usp=sharing.
  
-xxx+The deadline for providing feedback on the alpha version of the new web site is Tuesday July 2 at 10:00 am MDT.**
  
 ---- ----
Line 96: Line 98:
  
 Open action items from previous meetings: Open action items from previous meetings:
-  * Nancy: get ROM costs for new KOSMOS grisms. UPDATE: We are in the process of putting together some quotes and working with vendors, and will make decisions from thereWe will use examples that had been requested by users previously in order to get quotes so we have some idea of what will be possible. STATUS: OPEN. +  * Nancy: get ROM costs for new KOSMOS grisms. Sarah Tuttle provided an update on this at today's meeting. She is working on getting quotes from 4 different vendors, two of which have been responsive. There are some glass supply chain issues, which is making it more challenging to get a solid quoteThe approximate cost per grism will be ~ $20k-$30k; if we bundle an order of several grisms together we may get a slight discount but probably not a substantial one. When KPNO purchased additional grisms they bought them piecemeal and then assembled them in-house; we would prefer not to do that. Once Sarah receives some final quotes she will discuss them with Nancy and then we will check in with the Users Committee again to identify final priorities. STATUS: OPEN. 
-  * UC reps: remind your users to review the Q2 schedule and request OPEN/DD time if they can make a good case for it. +  * UC reps: remind your users to review the Q2 schedule and request OPEN/DD time if they can make a good case for it. STATUS: OPEN
-  * UC reps: publication record+  * UC reps: remind your users to send Nancy references for all 3.5m- and 0.5m-related publications from Jan. 1 2023 to present by the deadline of June 30. STATUS: OPEN.
  
 Open action items from this meeting: Open action items from this meeting:
-  * UC reps: web site +  * UC reps: please notify your ARCTIC users that the diffuser rotation capability is available once again.  
 +  * UC reps: ask your users to review the alpha version of the new web site to determine whether the content they are used to finding on the web site is still there and easy to find. All feedback should be provided through the Google sheet given above. The deadline for user feedback on the web site content is July 2.
  
 ---- ----
  
 === All Other Business === === All Other Business ===
 +
 +None.
  
 ---- ----
uc/uc20240604_june_4_2024.1717519128.txt.gz · Last modified: 2024/06/04 16:38 by nchanove