This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20240507_may_7_2024 [2024/05/07 22:42] nchanove |
uc:uc20240507_may_7_2024 [2024/05/08 16:58] (current) nchanove |
||
---|---|---|---|
Line 64: | Line 64: | ||
=== Additional telescope and instrument discussion === | === Additional telescope and instrument discussion === | ||
- | The recent fire in Timberon was contained quickly and little smoke came towards APO so we were not affected. We've had good weather at the site recently. The OU class visit went well, The APOLLO team was also on site in late April for some engineering work. The new 1.25" slits for KOSMOS arrived from UW today; they will be inspected and then installed into KOSMOS. There was an all-hands 3.5m observing specialist training on APOLLO operations on April 22. It went well, and Russet is doing a phenomenal | + | The recent fire in Timberon was contained quickly and little smoke came towards APO so we were not affected. We've had good weather at the site recently. The OU class visit went well, The APOLLO team was on site in late April for some engineering work. The new 1.25" slits for KOSMOS arrived from UW today; they will be inspected and then installed into KOSMOS. There was an all-hands 3.5m observing specialist training on APOLLO operations on April 22. It went well, and Russet is doing an outstanding |
---- | ---- | ||
Line 70: | Line 70: | ||
=== Summer shutdown schedule === | === Summer shutdown schedule === | ||
- | Summer shutdown is scheduled for August 12-26, inclusive. There will be some instrument servicing done throughout the summer but several of them are used so frequently that they will be handled during the shutdown. The observatory staff will also do the routine and critical maintenance items, such as those to eliminate moth problems, and then turn the telescope back over to the users. We will not be taking the telescope apart this year given that we had the primary mirror realuminized last summer. We plan to give the observing specialists some more training time coming out of shutdown so that they can get more experience | + | Summer shutdown is scheduled for August 12-26, inclusive. There will be some instrument servicing done throughout the summer but several of the instruments |
---- | ---- | ||
- | |||
=== 2024 Q2 3.5m scheduling === | === 2024 Q2 3.5m scheduling === | ||
- | Lot of open time in June - let your users know that there is a dark DD night on June 5. Some slots are short but see the schedule. | + | We have a some unassigned |
- | + | ||
- | We have a some unassigned time (OPEN or DD02) remaining in Q4. Please | + | |
---- | ---- | ||
Line 85: | Line 82: | ||
=== 2024 Q3 3.5m scheduling === | === 2024 Q3 3.5m scheduling === | ||
- | Allocation | + | The allocation |
---- | ---- | ||
Line 91: | Line 88: | ||
=== 2024 Q2 0.5 scheduling === | === 2024 Q2 0.5 scheduling === | ||
- | May 11-16 open and more in early June. | + | There is some open ARCSAT time on May 11-16 and more in early June. Please email the scheduling team if you wish to request it. |
---- | ---- | ||
- | === Publications update request | + | === Annual Request to Update Publication Record |
- | June 30 deadline. | + | **Please send Nancy any references for 3.5m-related publications (anything published from Jan 1 2023 to now). The deadline is June 30.** Understanding the scientific usage and impact of the telescope is critical for evaluating future projects, initiatives, |
---- | ---- | ||
Line 105: | Line 102: | ||
Open action items from previous meetings: | Open action items from previous meetings: | ||
* Nancy: get ROM costs for new KOSMOS grisms. UPDATE: We are in the process of putting together some quotes and working with vendors, and will make decisions from there. We will use examples that had been requested by users previously in order to get quotes so we have some idea of what will be possible. STATUS: OPEN. | * Nancy: get ROM costs for new KOSMOS grisms. UPDATE: We are in the process of putting together some quotes and working with vendors, and will make decisions from there. We will use examples that had been requested by users previously in order to get quotes so we have some idea of what will be possible. STATUS: OPEN. | ||
- | * UC reps: remind your users that observers must respond to reminder emails at least 24 hours in advance. | + | * UC reps: remind your users that observers must respond to reminder emails at least 24 hours in advance. STATUS: CLOSED. |
+ | |||
+ | Open action items from this meeting: | ||
+ | * Nancy: send Muk the feedback form to distribute to the students. (done!) | ||
+ | * Nancy: contact NAPG to ask about their summer visit plans. (done!) | ||
+ | * UC reps: remind your users to review the Q2 schedule and request OPEN/DD time if they can make a good case for it. | ||
---- | ---- | ||
Line 111: | Line 113: | ||
=== All Other Business === | === All Other Business === | ||
- | Web site work. Shane has created whole separate | + | Ben Williams provided an update regarding |
---- | ---- |