This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20240206_february_6_2024 [2024/02/12 17:58] nchanove |
uc:uc20240206_february_6_2024 [2024/02/13 01:38] (current) nchanove |
||
---|---|---|---|
Line 7: | Line 7: | ||
=== Introductions === | === Introductions === | ||
- | We started by introducing Mark Croom, our newest | + | We started by introducing Mark Croom, our new part-time Observing Specialist. Mark is an upper level Astronomy graduate student at NMSU and spent the majority of his career as an aerospace engineer at NASA Langley Research Center before pursuing his passion for astronomy. Although he has been a long-time user of the 3.5m at APO, he began his training as a 3.5m obs-spec in January 2024. We look forward to working with him! |
=== User feedback and comments from institutional representatives === | === User feedback and comments from institutional representatives === | ||
Line 39: | Line 39: | ||
2) Operations | 2) Operations | ||
- | |||
- | 3.5m Telescope: | ||
3.5m Telescope: Telescope is working well, motion errors seem to be of the seasonal type. | 3.5m Telescope: Telescope is working well, motion errors seem to be of the seasonal type. | ||
Line 62: | Line 60: | ||
General | General | ||
- | Snow on the roof issue: The recent winter weather has impacted our ability to open, even during clear nights, due to the accumulation of snow on the enclosure roof. [If we open the enclosure when there is snow on the roof, it will fall down onto the telescope.] There are heaters on the edge of the dome building (not across the top), which we use to help melt the snow. However, the main mechanism for snow removal is the sunshine; if it's not sunny (as it has not been shortly | + | Snow on the roof issue: The recent winter weather has impacted our ability to open, even during clear nights, due to the accumulation of snow on the enclosure roof. [If we open the enclosure when there is snow on the roof, it will fall down onto the telescope.] There are heaters on the edges of the dome building (not across the top), which we use to help melt the snow. However, the main mechanism for snow removal is sunshine; if it's not sunny -- which has been the case after the recent snow storms |
- | ARCES issue: ARCES had a failure in its autofill system that caused it to warm up, taking it over service for several weeks. We are pumping it down right now and then will cool it. The earliest possible date that it will return to service is likely around February 16, but it could extend beyond that. The dewar is a big volume to pump down and the cooling will be rather delicate. It has been at least a decade since we have done this in winter time. We have all of the replacement parts for fill system in hand and they are ready to be installed. | + | ARCES issue: ARCES had a failure in its autofill system that caused it to warm up, taking it out of service for several weeks. We are pumping it down right now and then will cool it. The earliest possible date that it will return to service is likely around February 16, but it could extend beyond that. The dewar is a big volume to pump down and the cooling will be rather delicate. It has been at least a decade since we have done this in wintertime. We have all of the replacement parts for fill system in hand and they are ready to be installed. |
- | + | ||
- | DIS issue: The DIS red channel seems to have had an electronics failure, with all pixels reading the same value. There are no immediate plans to repair it; we have tried every intervention we can do from the outside of the instrument to recover the red camera and not met with any success. We currently don't have the in-house expertise to do an internal repair. | + | |
- | + | ||
- | + | ||
- | DIS - future outlook - retirement | + | |
- | Russet - we have tried every intervention we can do from the outside to recover the red camera Currently don't have in house expertise to cover repair. May be a few things to try next week. We | + | |
- | No one using | + | |
- | Couple of slots left for gratings in KOSMOS - someone at UW likes DIS because higher res, other because get whole spectrum in one shot - could add lower res or higher res gratings | + | |
- | Joanne - vote for higher res for velocities - determining if star is member of globular cluster | + | |
- | Russet: KOSMOS does have to grisms not gratings. 4 open slots but 1 needs to be left open (2 higher res and one lower?) | + | |
- | + | ||
- | Joanne - any estimates of costs of grisms? NC : estimates $10-30k? | + | |
- | Do have a complete set of 1.25" slits (low and high pos) better matched to site seeing, can optimally sample site seeing now | + | |
+ | DIS issue: The DIS red channel has had an electronics failure, with all pixels reading the same value. There are no immediate plans to repair it; we have tried every intervention we can do from the outside of the instrument to recover the red camera and not met with any success. We currently don't have the in-house expertise to do an internal repair. This raises the broader issue of when (not if) to decommission DIS. As the oldest instrument on the 3.5m, it continues to show its age and perform sub-optimally. Recall that the acquisition of KOSMOS was intended as a stop-gap measure that would provide continued capability for long-slit optical spectroscopy while Ocotillo is being developed and built. Nearly all former DIS users have migrated to KOSMOS, but there remain a few DIS holdouts. **UC reps: please tell your users that we need to understand what capabilities KOSMOS lacks that makes some people still want to use DIS.** If it is a resolution issue (either the desire for higher or lower resolution than what is offered by KOSMOS), we still have several slots remaining in the wheel that holds the grisms for KOSMOS. If people want/need different resolution, in principle we could fulfill this need with the addition of one low-res grating that would get the entire spectrum in one shot, and two higher-res gratings. Russet noted that we do now have a complete set of 1.25" and 20" slits (low, center, and high position) which are better matched to the site seeing, so users can now optimally sample the site seeing. **Nancy will follow up with Sarah to get some ROM estimates of costs for additional grisms.** | ||
---- | ---- | ||
Line 84: | Line 70: | ||
=== 2024 Q1 3.5m scheduling === | === 2024 Q1 3.5m scheduling === | ||
- | There have been some updates to Q1 based largely on reshuffling ARCES time around. Short slot on Feb 18B and Feb 22A (HN - 1 hr) - can' | + | There have been some updates to the Q1 schedule |
---- | ---- | ||
Line 90: | Line 76: | ||
=== 2024 Q2 3.5m scheduling === | === 2024 Q2 3.5m scheduling === | ||
- | Q2 allocation emails | + | The Q2 allocation emails |
---- | ---- | ||
Line 96: | Line 82: | ||
=== 2024 Q1 0.5m scheduling === | === 2024 Q1 0.5m scheduling === | ||
- | Q1 schedule is basically full. One week when have classes on site is listed as unavailable. q2 call in mid-March. | + | The Q1 schedule |
---- | ---- | ||
Line 102: | Line 88: | ||
=== Meetings === | === Meetings === | ||
- | * Jan. 2024 AAS Recap - thanks | + | * Jan. 2024 AAS Recap - Thanks |
- | * 30th anniversary celebration? - possibility | + | * Nancy asked the group to consider one last time the idea of holding an APO 30th anniversary celebration |
---- | ---- | ||
Line 112: | Line 98: | ||
* None | * None | ||
+ | |||
+ | Open action items from this meeting: | ||
+ | |||
+ | * UC reps: ask your users what capabilities KOSMOS lacks that makes some people still want to use DIS | ||
+ | * Nancy: get ROM costs for new KOSMOS grisms | ||
+ | * UC reps: remind your users to review the Q1 schedule and request OPEN/DD time if they can make a good case for it. | ||
---- | ---- | ||
Line 117: | Line 109: | ||
=== All Other Business === | === All Other Business === | ||
- | DIS decommissioning? | + | None. |
---- | ---- |