This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | |||
uc:uc20230606_june_6_2023 [2023/06/06 19:24] nchanove |
uc:uc20230606_june_6_2023 [2023/06/06 19:24] (current) nchanove |
||
---|---|---|---|
Line 87: | Line 87: | ||
---- | ---- | ||
- | === Q2 0.5m scheduling === | + | === Q2-Q3 0.5m scheduling === |
There is an open week from June 25 to July 1 but this is not scheduleable due to the fact that we will have a visiting instrument on 3.5m that will require all of the attention of the observing specialist. Once the Q3 3.5m schedule comes out we will issue a call for Q3 ARCSAT proposals. ARCSAT will be following the same shutdown schedule as the 3.5m, thus it will not be operating during summer shutdown. There have been some recent issues with BYUCam that we think we have traced to a hardware problem. We are currently encouraging people to use FlareCam and will include more information about the status of BYUCam in the Q3 call for proposals. | There is an open week from June 25 to July 1 but this is not scheduleable due to the fact that we will have a visiting instrument on 3.5m that will require all of the attention of the observing specialist. Once the Q3 3.5m schedule comes out we will issue a call for Q3 ARCSAT proposals. ARCSAT will be following the same shutdown schedule as the 3.5m, thus it will not be operating during summer shutdown. There have been some recent issues with BYUCam that we think we have traced to a hardware problem. We are currently encouraging people to use FlareCam and will include more information about the status of BYUCam in the Q3 call for proposals. |