This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20230606_june_6_2023 [2023/06/06 18:08] nchanove |
uc:uc20230606_june_6_2023 [2023/06/06 19:24] (current) nchanove |
||
---|---|---|---|
Line 3: | Line 3: | ||
---- | ---- | ||
- | Attending: Nancy Chanover (NMSU), Jamey Eriksen (APO), Gordon MacDonald (APO), Joanne Hughes (Seattle U), Aleksandr Mosenkov (BYU), Eric Bellm (UW), Anne Verbiscer (UVa), Misty Bentz (GSU), Ben Williams (UW), Kevin Schlaufman (JHU), Misty Bentz (GSU), Eric Nielsen (NMSU), Chip (UWy), Russet McMillan (APO) | + | Attending: Nancy Chanover (NMSU), Jamey Eriksen (APO), Gordon MacDonald (APO), Joanne Hughes (Seattle U), Aleksandr Mosenkov (BYU), Eric Bellm (UW), Anne Verbiscer (UVa), Misty Bentz (GSU), Ben Williams (UW), Kevin Schlaufman (JHU), Misty Bentz (GSU), Eric Nielsen (NMSU), Chip Kobulnicky |
=== User feedback and comments from institutional representatives === | === User feedback and comments from institutional representatives === | ||
Line 61: | Line 61: | ||
June is going to be a busy month with multiple groups visiting, as indicated in the above report. Russet reports that recent engineering data with DIS show that the red side is looking a bit better and | June is going to be a busy month with multiple groups visiting, as indicated in the above report. Russet reports that recent engineering data with DIS show that the red side is looking a bit better and | ||
- | is "kinda usable," | + | is "kinda usable," |
To reiterate from last month, ** summer shutdown will start on July 26 and the anticipated return to science is August 22 ** (although that could slip by several days if the weather during engineering recovery is poor or if the coating process takes more time than anticipated). | To reiterate from last month, ** summer shutdown will start on July 26 and the anticipated return to science is August 22 ** (although that could slip by several days if the weather during engineering recovery is poor or if the coating process takes more time than anticipated). | ||
- | Last Friday APO hosted a visit from the NMSU Provost. A site visit is helpful for our institutional administrators | + | Last Friday APO hosted a visit from the new NMSU Provost. A site visit is helpful for our institutional administrators |
---- | ---- | ||
Line 71: | Line 71: | ||
=== KOSMOS update === | === KOSMOS update === | ||
- | Investigating | + | We have received several reports of scattered light being a problematic issue for certain types of observations with KOSMOS. We have been in contact with the affected users and have a meeting scheduled to discuss it and learn more about it next week; a mitigation plan will be forthcoming after that. This concern |
---- | ---- | ||
Line 83: | Line 83: | ||
=== Q3 3.5m scheduling === | === Q3 3.5m scheduling === | ||
- | schedule in progress, should be able to publish in a few days, very little | + | The Q3 schedule |
- | 1 class visit in July | + | |
- | 1 visiting instrument run | + | |
- | VENUS | + | |
---- | ---- | ||
- | === Q2 0.5m scheduling === | + | === Q2-Q3 0.5m scheduling === |
- | Open June 25-July 1 - not schedulable | + | There is an open week from June 25 to July 1 but this is not scheduleable |
- | + | ||
- | when Q3 schedule comes out we will put out call for ARCSAT | + | |
- | not operating during summer shutdown | + | |
- | + | ||
- | BYUCam is having | + | |
---- | ---- | ||
- | |||
=== Annual Request to Update Publication Record === | === Annual Request to Update Publication Record === | ||
Line 112: | Line 103: | ||
Open action items from previous meetings: | Open action items from previous meetings: | ||
- | * Nancy: track down missing ARCTIC data reduction scripts for wiki. -> OPEN | + | * Nancy: track down missing ARCTIC data reduction scripts for wiki. -> OPEN. Making progress on it this week. |
* UC reps: remind your users to review the Q2 schedule and request OPEN/DD time if they can make a good case for it. -> OPEN | * UC reps: remind your users to review the Q2 schedule and request OPEN/DD time if they can make a good case for it. -> OPEN | ||
* UC reps: Notify your users that we have funds to purchase slit masks for MOS runs with KOSMOS -> CLOSED | * UC reps: Notify your users that we have funds to purchase slit masks for MOS runs with KOSMOS -> CLOSED | ||
Line 121: | Line 112: | ||
New action items from this meeting: | New action items from this meeting: | ||
- | xxx | + | * UC reps: please urge your users to review the Q3 schedule and let us know immediately if there are errors. |
+ | * UC reps: please notify your department members of the July 31 deadline for sending Nancy listings of papers from January 1, 2022 to present that made use of 3.5m and/or ARCSAT data. | ||
---- | ---- | ||
Line 127: | Line 119: | ||
=== All Other Business === | === All Other Business === | ||
- | xxx | + | None. |
---- | ---- |