This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20230606_june_6_2023 [2023/06/05 21:03] nchanove |
uc:uc20230606_june_6_2023 [2023/06/06 19:24] (current) nchanove |
||
---|---|---|---|
Line 3: | Line 3: | ||
---- | ---- | ||
- | Attending: Nancy Chanover (NMSU), | + | Attending: Nancy Chanover (NMSU), Jamey Eriksen (APO), Gordon MacDonald (APO), Joanne Hughes (Seattle U), Aleksandr Mosenkov (BYU), Eric Bellm (UW), Anne Verbiscer (UVa), |
- | + | ||
- | Jamey Eriksen (APO), Gordon MacDonald (APO), Joanne Hughes (Seattle U), Aleksandr Mosenkov (BYU), Bill Ketzeback (APO), Eric Bellm (UW), Anne Verbiscer (UVa), | + | |
=== User feedback and comments from institutional representatives === | === User feedback and comments from institutional representatives === | ||
- | nothing to report | + | * JHU - nothing to report |
- | no report | + | * UVa - nothing to report |
- | + | * Georgia State - nothing to report | |
- | * JHU - | + | * NMSU - Eric is glad to be able to attend UC meetings once again, otherwise nothing to report |
- | * UVa - | + | * Seattle - Joanne reports that her team had a wonderful visit to APO in May. They brought 3 students from Seattle University and 4 from Saint Martin' |
- | * Georgia State - | + | * FGCU - nothing to report other than some recent bad weather (sent by email) |
- | * NMSU - | + | * Colorado - no report |
- | * Seattle - | + | * Oklahoma - nothing to report |
- | * FGCU - | + | * Washington - nothing to report |
- | * Colorado - | + | * BYU - nothing to report |
- | * Oklahoma - | + | * Wyoming - nothing to report |
- | * Washington - | + | * NAPG - no report |
- | * BYU - | + | |
- | * Wyoming - | + | |
- | * NAPG - | + | |
---- | ---- | ||
Line 65: | Line 60: | ||
=== Additional telescope and instrument discussion === | === Additional telescope and instrument discussion === | ||
- | ** Shutdown will start on July 26 and the anticipated return | + | June is going to be a busy month with multiple groups visiting, as indicated in the above report. Russet reports that recent engineering data with DIS show that the red side is looking a bit better and |
+ | is "kinda usable," | ||
- | visit from NMSU administration | + | To reiterate from last month, ** summer shutdown will start on July 26 and the anticipated return to science is August 22 ** (although that could slip by several days if the weather during engineering recovery is poor or if the coating process takes more time than anticipated). |
+ | |||
+ | Last Friday APO hosted a visit from the new NMSU Provost. A site visit is helpful for our institutional administrators to see the nature of the facility and learn more about their research investment. Some institutional representatives will have an opportunity to visit APO this November in conjunction with the ARC Board of Governors meeting, but we would welcome other visits from institutional administrators if there is ever a need or desire to schedule one. | ||
---- | ---- | ||
Line 73: | Line 71: | ||
=== KOSMOS update === | === KOSMOS update === | ||
- | Investigating | + | We have received several reports of scattered light being a problematic issue for certain types of observations with KOSMOS. We have been in contact with the affected users and have a meeting scheduled to discuss it and learn more about it next week; a mitigation plan will be forthcoming after that. This concern |
---- | ---- | ||
Line 85: | Line 83: | ||
=== Q3 3.5m scheduling === | === Q3 3.5m scheduling === | ||
- | xxx | + | The Q3 schedule is in progress and we expect to publish it in a few days. Challenges in building the Q3 schedule include a class visit in July, a visiting instrument run, and the fact that several users will be attempting to observe Venus in the pre-dawn hours. Due to the fact that Q3 is a short quarter because of the summer shutdown there will be very little DD or OPEN time available (and there could be even less if there are difficulties with summer shutdown or recovery). **UC reps: please urge your users to review the Q3 schedule and let us know immediately if there are errors**; it will be much more challenging to fix them later in the quarter since we will have very little flexibility in the schedule. |
---- | ---- | ||
- | === Q2 0.5m scheduling === | + | === Q2-Q3 0.5m scheduling === |
- | Open June 25-July 1 | + | There is an open week from June 25 to July 1 but this is not scheduleable due to the fact that we will have a visiting instrument on 3.5m that will require all of the attention of the observing specialist. Once the Q3 3.5m schedule comes out we will issue a call for Q3 ARCSAT proposals. ARCSAT will be following the same shutdown schedule as the 3.5m, thus it will not be operating during summer shutdown. There have been some recent issues with BYUCam that we think we have traced to a hardware problem. We are currently encouraging people to use FlareCam and will include more information about the status of BYUCam in the Q3 call for proposals. |
---- | ---- | ||
- | |||
=== Annual Request to Update Publication Record === | === Annual Request to Update Publication Record === | ||
Line 106: | Line 103: | ||
Open action items from previous meetings: | Open action items from previous meetings: | ||
- | * Nancy: track down missing ARCTIC data reduction scripts for wiki. -> OPEN | + | * Nancy: track down missing ARCTIC data reduction scripts for wiki. -> OPEN. Making progress on it this week. |
* UC reps: remind your users to review the Q2 schedule and request OPEN/DD time if they can make a good case for it. -> OPEN | * UC reps: remind your users to review the Q2 schedule and request OPEN/DD time if they can make a good case for it. -> OPEN | ||
* UC reps: Notify your users that we have funds to purchase slit masks for MOS runs with KOSMOS -> CLOSED | * UC reps: Notify your users that we have funds to purchase slit masks for MOS runs with KOSMOS -> CLOSED | ||
Line 115: | Line 112: | ||
New action items from this meeting: | New action items from this meeting: | ||
- | xxx | + | * UC reps: please urge your users to review the Q3 schedule and let us know immediately if there are errors. |
+ | * UC reps: please notify your department members of the July 31 deadline for sending Nancy listings of papers from January 1, 2022 to present that made use of 3.5m and/or ARCSAT data. | ||
---- | ---- | ||
Line 121: | Line 119: | ||
=== All Other Business === | === All Other Business === | ||
- | xxx | + | None. |
---- | ---- |