User Tools

Site Tools


uc:uc20230207_february_7_2023

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
uc:uc20230207_february_7_2023 [2023/03/01 18:01]
nchanove
uc:uc20230207_february_7_2023 [2023/03/01 18:04] (current)
nchanove
Line 101: Line 101:
  
   * Nancy: start investigations re: short wavelength throughput (climate data, other facilities). No news. Going forward we are tabling this action item and will not be reporting on it since we are in the process of sorting out the realuminization plans for M1, which takes priority. Status: TABLED.   * Nancy: start investigations re: short wavelength throughput (climate data, other facilities). No news. Going forward we are tabling this action item and will not be reporting on it since we are in the process of sorting out the realuminization plans for M1, which takes priority. Status: TABLED.
-  * Nancy: make sure that the APO web site gets updated to address the issues reported by Eric B. in December. Status: OPEN. There were several issue that needed to be addressed. a) the wiki link on the 3.5m page still pointed to the old wiki - //this was fixed.// b) the Search Site function on the APO home page does not work. //Testing is ongoing to solve this;// it appears to be a VPN issue for the site web server (i.e., it works for people at APO but does not work for people accessing the web pages from off-site locations). c) the ToO policy is not easily found. //We are working on a document// that we can post on the scheduling page to make this information more easy to locate.+  * Nancy: make sure that the APO web site gets updated to address the issues reported by Eric B. in December. Status: OPEN. There were several issue that needed to be addressed
 +     the wiki link on the 3.5m page still pointed to the old wiki - //this was fixed.// 
 +     the Search Site function on the APO home page does not work. //Testing is ongoing to solve this;// it appears to be a VPN issue for the site web server (i.e., it works for people at APO but does not work for people accessing the web pages from off-site locations). 
 +     the ToO policy is not easily found. //We are working on a document// that we can post on the scheduling page to make this information more easy to locate.
   * UC reps: distribute information about the AAS meeting and our request for participation/help at the booth. Status: CLOSED.   * UC reps: distribute information about the AAS meeting and our request for participation/help at the booth. Status: CLOSED.
   * Nancy: send out a new calendar invitation with the UC meeting dates for 2023. Status: CLOSED.   * Nancy: send out a new calendar invitation with the UC meeting dates for 2023. Status: CLOSED.
uc/uc20230207_february_7_2023.1677693716.txt.gz · Last modified: 2023/03/01 18:01 by nchanove