=== Q1 ARCSAT scheduling === | === Q1 ARCSAT scheduling === | ||
- | There is some open time available in March. The Observing Specialists are getting trained on the Shelyak so that it can eventually be made available to the broader user community. We received a long-term loan of an FLI imaging camera (to replace SurveyCam)from BYU and we hope to have it available and ready for use in Q2. | + | There is some open time available in March. The Observing Specialists are getting trained on the Shelyak so that it can eventually be made available to the broader user community. We received a long-term loan of an FLI imaging camera (to replace SurveyCam) from BYU and we hope to have it available and ready for use in Q2. |
---- | ---- | ||
Line 90: | Line 90: | ||
=== AAS 241 Meeting Recap === | === AAS 241 Meeting Recap === | ||
- | Nancy provided a brief summary of how things went at the APO booth we had at AAS 241 in Seattle. As a reminder, the goals of having a booth were to raise the visibility of the facility, talk to others in the industry, showcase the science results enabled by observations at APO, provide a center for ARC members to connect with each other, and promote the open positions at the observatory since we are currently hiring. The generally | + | Nancy provided a brief summary of how things went at the APO booth we had at the AAS 241 meeting |
+ | |||
+ | The general | ||
---- | ---- | ||
Line 99: | Line 101: | ||
* Nancy: start investigations re: short wavelength throughput (climate data, other facilities). No news. Going forward we are tabling this action item and will not be reporting on it since we are in the process of sorting out the realuminization plans for M1, which takes priority. Status: TABLED. | * Nancy: start investigations re: short wavelength throughput (climate data, other facilities). No news. Going forward we are tabling this action item and will not be reporting on it since we are in the process of sorting out the realuminization plans for M1, which takes priority. Status: TABLED. | ||
- | * Nancy: make sure that the APO web site gets updated to address the issues reported by Eric B. in December. Status: OPEN. There were several issue that needed to be addressed. a) the wiki link on the 3.5m page still pointed to the old wiki - //this was fixed.// | + | * Nancy: make sure that the APO web site gets updated to address the issues reported by Eric B. in December. Status: OPEN. There were several issue that needed to be addressed: |
+ | | ||
+ | | ||
+ | | ||
* UC reps: distribute information about the AAS meeting and our request for participation/ | * UC reps: distribute information about the AAS meeting and our request for participation/ | ||
* Nancy: send out a new calendar invitation with the UC meeting dates for 2023. Status: CLOSED. | * Nancy: send out a new calendar invitation with the UC meeting dates for 2023. Status: CLOSED. |