uc:uc20230207_february_7_2023

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
uc:uc20230207_february_7_2023 [2023/03/01 15:55]
nchanove
uc:uc20230207_february_7_2023 [2023/03/01 18:04] (current)
nchanove
Line 14: Line 14:
   * NMSU - no report   * NMSU - no report
   * Seattle - nothing to report other than Joanne is intending to bring a class to APO towards the end of Q2   * Seattle - nothing to report other than Joanne is intending to bring a class to APO towards the end of Q2
-  * Colorado - a user contacted their UC rep to express interest in getting an update on the echelle upgrade. They are curious about the process of information gathering for the design and asked whether large changes are still possible (e.g. the inclusion of spectropolarimetry, wavelength range, etc.). Nancy said that she is in the process of formulating a small tiger team to look at some of these issues from the science perspective. ** Nancy will develop a communications plan about instrumentation upgrades to share with the UC next month.** +  * Colorado - a user contacted Adam to express interest in getting an update on the echelle upgrade. They are curious about the process of information gathering for the design and asked whether large changes are still possible (e.g. the inclusion of spectropolarimetry, wavelength range, etc.). Nancy said that she is in the process of formulating a small tiger team to look at some of these issues from the science perspective. ** Nancy will develop a communications plan about instrumentation upgrades to share with the UC next month.** 
   * Wyoming - nothing to report   * Wyoming - nothing to report
   * Oklahoma - a user asked about the availability of quicklook reduction software for use with KOSMOS. ** Nancy will find out when pyKOSMOS is expected to be broadly available.**   * Oklahoma - a user asked about the availability of quicklook reduction software for use with KOSMOS. ** Nancy will find out when pyKOSMOS is expected to be broadly available.**
Line 54: Line 54:
 === Additional telescope and instrument discussion ===  === Additional telescope and instrument discussion === 
  
-Open to new formats/inputs on report. Horizontal snow. Major rockslide on HW 82. Closed road for 4 days. Rocks pushed over into canyon. Saturday 8 am through Tuesday closed. Closed shortest bypass as well. Extra 1.5 hrs to get to APO. Dodged a bullet with LN2 delivery not needed'' NC to send links of pics, video''+Jamey indicated that he is open to suggestions for new formats or content on his monthly site report; if people have requests please let him or your UC rep knowThe observatory is currently experiencing horizontal snow (!)There was a major rockslide (more like rock-fall) on HW 82 coming up from Alamogordo, just before the tunnelThis closed the road for 4 days while NMDOT worked to clear the road (which including pushing some rocks over the edge into the canyon)This meant that it took an extra 1.5 hrs to get to APO from AlamogordoFortunately we did not have any LN2 deliveries scheduled during the closure. Here are some pictures: {{:uc:49d598be-0896-4941-9785-c3b2469fabe5.png?linkonly|Pic1}} {{ :uc:586b8535-be95-499a-ad45-55f4ae039510.png?linkonly|Pic2}} {{ :uc:259759d5-906a-4d4e-9221-2b96ce8a84bd.png?linkonly |Pic3}}.
  
-DSSI group coming in early March, CU class right after that. KOSMOS servicing CTE issuecleanup of readouts.+The DSSI group is coming in early March, and a CU class is arriving right after that. We are trying to schedule a KOSMOS servicing visit from Sarah Tuttle to address the CTE issue and cleanup of readouts.
  
-DIS measurements on sky last night peak brightness is 10% of last year. in red can sum pixels net effect is like being out of focus. with 1x2 binning, peak ~ 40% of where it was a year ago +DIS measurements made on sky last night showed that the peak brightness is 10% of what it was last year. In the red one can sum pixels; the net effect is like being out of focus. With 1x2 binning, we are seeing a peak ~ 40% of where it was a year ago. Adam asked if the DIS contamination will be better by the time of the CU class visit, since Kevin France (class instructor) is a DIS user. Russet replied that the red will be noticeably better since this issue is temperature dependent  and it evolves more quickly in warmer weather. The blue side is coming up to point where it will turn around and start improving, but we probably won't see much change in the next month; we do expect to see continued improvement through May.
-Q : will DIS contemn be better by CU class visitFrance uses DIS +
-Red will be noticeably better (temp dependent evolves faster in warmer weather)Blue is coming up to point where it will turn around and start improving - prob won't see much change in next month  expect continued improvement through May+
  
-python3 most imp for Linux users OU, JHU, Wy, be on lookout for new software let us know if any problems+The TUI upgrade to python3 is available for user download and is probably most important for Linux users (of which there are quite a few at OU, JHU, and UWy). Users should install and use the new software and let us know if they have any problems with it.
  
 ---- ----
Line 68: Line 66:
 === KOSMOS update ===  === KOSMOS update === 
  
-nothing beyond what is above +Nothing to report beyond what is stated above.
  
 ---- ----
Line 74: Line 72:
 === Q1 3.5m scheduling === === Q1 3.5m scheduling ===
  
-Unassigned dates Feb 9 (have taker as of now - short in bright). After that is Feb 20B (dark, unencumbered), Mar 27B - have them ask us  +There are several unassigned dates remaining in the Q1 schedule: Feb 9 (short half, in bright time)Feb 20B (dark, unencumbered), and Mar 27B. [Note added in proof; only Mar 27B remains.]
- +
-We have two open dates coming up soon: Dec 13B (brightish) and Dec 16B (grey); Dec 17B is also open but has been requestedThen we have some dark slots (shorter, but still ~ 4 hours of time since the winter nights are longer) on 27-29 and 31 December. We have 5 slots total in late December, with 2 requests received so far. We welcome requests and are eager to fill the mid-December time, although we will not publish a schedule update until the Q1 schedule is finished (so around Dec 9 or 10).+
  
 ---- ----
Line 82: Line 78:
 === Q2 3.5m scheduling === === Q2 3.5m scheduling ===
  
-All schedulers have allocations for Q2. Requests are due 2/24. Include Amanda when sending in requests. Did block out early April for visiting instrument only middle 6 hrs of night will be available try to schedule Agile or ARCES during that time. Joanne 2 nights close together bring class up - doing bulge work - late May or June - needs to know personnel limits - KOSMOS and ARCTIC (5-7 people, how many adults, etc.)+All schedulers have received their allocations for Q2; requests are due 2/24. Schedulers: please include Amanda when sending in your requests. We blocked out several nights in early April for visiting instrument; during that period only the middle 6 hours of the night will be available. We will try to schedule Agile or ARCES during that time to avoid instrument changes. Joanne stated that she plans to request 2 nights in late May or June that are scheduled close together so that she can bring class up to observe with KOSMOS and ARCTIC. She needs to know personnel limits for the site (she anticipates bringing 5-7 students and several helpers). **Nancy will confirm the numbers with the operations crew offline and will report back to Joanne.**
  
 ---- ----
Line 88: Line 84:
 === Q1 ARCSAT scheduling === === Q1 ARCSAT scheduling ===
  
-open time but class Mar 13-19 +There is some open time available in March. The Observing Specialists are getting trained on the Shelyak so that it can eventually be made available to the broader user community. We received a long-term loan of an FLI imaging camera (to replace SurveyCam) from BYU and we hope to have it available and ready for use in Q2.
-non derek people observing with Shelyak +
-hoping new FLI will be available in Q2+
  
 ---- ----
Line 96: Line 90:
 === AAS 241 Meeting Recap === === AAS 241 Meeting Recap ===
  
-raises visibility +Nancy provided a brief summary of how things went at the APO booth we had at the AAS 241 meeting in Seattle. As a reminder, the goals of having a booth were to raise the visibility of the facility, talk to others in the industry, showcase the science results enabled by observations at APO, provide a center for ARC members to connect with each other, and promote the open positions at the observatory since we are currently hiring. 
-talk with others in industry  + 
-Bill: +The general feeling was that it was a very successful meetingand we achieved most of the aforementioned goals. Bill made some important face-to-face connections with people at other observatories as well as vendors from PlaneWave and FingerLakes, and Jamey highlighted the importance of the booth for talking to students (which could help with recruitment for the graduate programs of the ARC institutions). A number of students inquired about internship possibilities and short-term positions (e.g. during a gap year), so we ought to think more about whether that is something we would want to implement. Several UC reps said that their students were excited about the booth and that it was useful for raising visibility of the facility.
-very beneficial, other observatories stopped by booth, interact with PlaneWave and FingerLakes and other vendorsgood to make F2F connections, good student interest, internships and opportunities +
-Jamey+
-lots of ppl asking about summer internships, gap year, etc +
-good for recruitment purposes -  +
-showcase science +
-presence does ARC community good - recruitment +
-Joanne - students were excited about it. send students to MS in optical sciences in Oregon - need to attract engineers+
  
 ---- ----
Line 113: Line 100:
 Open action items from previous meetings: Open action items from previous meetings:
  
-  * Nancy: start investigations re: short wavelength throughput (climate data, other facilities). Status: OPEN. No news. Old news: Nancy reached out to some colleagues at other observatories to ask about short wavelength performance degradation of their optical coatingsShe got some names from Bill and will contact those individuals nextThe ongoing discussions about new coatings for the primary also relate to this issue so we will determine our coatings first before continuing to pursue this line of investigation.+  * Nancy: start investigations re: short wavelength throughput (climate data, other facilities). No news. Going forward we are tabling this action item and will not be reporting on it since we are in the process of sorting out the realuminization plans for M1, which takes priority. StatusTABLED. 
 +  * Nancy: make sure that the APO web site gets updated to address the issues reported by Eric B. in December. Status: OPEN. There were several issue that needed to be addressed: 
 +     * the wiki link on the 3.5m page still pointed to the old wiki - //this was fixed.// 
 +     the Search Site function on the APO home page does not work. //Testing is ongoing to solve this;// it appears to be a VPN issue for the site web server (i.e., it works for people at APO but does not work for people accessing the web pages from off-site locations). 
 +     * the ToO policy is not easily found. //We are working on a document// that we can post on the scheduling page to make this information more easy to locate. 
 +  * UC reps: distribute information about the AAS meeting and our request for participation/help at the booth. Status: CLOSED. 
 +  * Nancy: send out a new calendar invitation with the UC meeting dates for 2023. Status: CLOSED.
  
 New action items from this meeting: New action items from this meeting:
  
-  * Nancy: make sure that the APO web site gets updated to address the issues reported by Eric B. +  * Nancy or Russetget sample KOSMOS data from JHU user who reported scattered light issue 
-  * UC repsdistribute information about the AAS meeting and our request for participation/help at the booth. +  * Nancyshare communications plan re: new instrumentation with UC at next meeting 
-  * Nancy: send out a new calendar invitation with the UC meeting dates for 2023.+  * Nancy: get updated on pyKOSMOS and report to UC next month 
 +  * Nancy: notify Joanne of site restrictions regarding maximum number of people in visiting group
  
 ---- ----
Line 131: Line 125:
 === Next meeting === === Next meeting ===
  
-The next meeting will be on **Tuesday Mach 7, 10:30 am MST.**+The next meeting will be on **Tuesday March 7, 10:30 am MST.**
  
 ---- ----
uc/uc20230207_february_7_2023.1677686123.txt.gz · Last modified: 2023/03/01 15:55 by nchanove