User Tools

Site Tools


uc:uc20221101_november_1_2022

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
uc:uc20221101_november_1_2022 [2022/12/06 16:53]
nchanove
uc:uc20221101_november_1_2022 [2022/12/06 18:43] (current)
nchanove
Line 3: Line 3:
 ---- ----
  
-Attending: Nancy Chanover (NMSU), Chip Kobulnicky (UWy), Jamey Eriksen (APO), Anne Verbiscer (UVa), Derek Buzasi (FGCU),  Eric Nielsen (NMSU), Sarah Tuttle (UW), Bill Ketzeback (APO), Kevin Schlaufman (JHU), Joanne Hughes (Seattle U), Aleksandr Mosenkov (BYU), Mukremin Kilic (OU), Misty Bentz (GSU), Russet McMillan (APO), Caleb Wang (UW), Ben Williams (UW), Gordon MacDonald (APO)+Attending: Nancy Chanover (NMSU), Chip Kobulnicky (UWy), Jamey Eriksen (APO), Anne Verbiscer (UVa), Derek Buzasi (FGCU),  Eric Nielsen (NMSU), Sarah Tuttle (UW), Bill Ketzeback (APO), Kevin Schlaufman (JHU), Joanne Hughes (Seattle U), Aleksandr Mosenkov (BYU), Mukremin Kilic (OU), Misty Bentz (GSU), Russet McMillan (APO), Caleb Wang (UW), Ben Williams (UW), Gordon MacDonald (APO), Adam Kowalski (CU)
  
 === User feedback and comments from institutional representatives === === User feedback and comments from institutional representatives ===
Line 10: Line 10:
   * BYU - nothing to report   * BYU - nothing to report
   * Washington - nothing to report (sent by email)   * Washington - nothing to report (sent by email)
-  * Colorado - nothing report+  * Colorado - nothing to report
   * UVa - nothing to report   * UVa - nothing to report
   * FGCU - nothing to report   * FGCU - nothing to report
Line 86: Line 86:
 === Q1 3.5m scheduling === === Q1 3.5m scheduling ===
  
-Allocation emails will be going out tomorrow hopefully, and will have a somewhat early turnaround with requests due by 11/22/2022 to avoid getting into the Thanksgiving holiday breaks,+Allocation emails will be going out tomorrow hopefully, and will have a somewhat early turnaround with requests due by 11/22/2022 to avoid the week of Thanksgiving.
  
 ---- ----
Line 92: Line 92:
 === Q4 ARCSAT scheduling === === Q4 ARCSAT scheduling ===
  
-There is unassigned time available with FlareCam. We used some time in October to train the obs-specs on Shelyak operations. Interested users should contact Ben, Russet, Nancy, Amanda and Bill to determine whether there is an option for getting trained. We are not yet ready to offer the Shelyak as a general use instrument on ARCSAT due to software issues that make its operation challenging. But we are open to testing the waters with a few users who might be interested in helping us refine its operation.+There is unassigned time available with FlareCam. We used some time in October to train the obs-specs on Shelyak operations. Interested users should contact Ben, Russet, Nancy, Amanda and Bill to determine whether there is an option for getting trained. We are not yet ready to offer the Shelyak as a general use instrument on ARCSAT due to software issues that make its operation challenging, but we are open to testing the system with a few users who might be interested in helping us refine its operation.
  
 ---- ----
uc/uc20221101_november_1_2022.1670345615.txt.gz · Last modified: 2022/12/06 16:53 by nchanove