This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20220906_september_6_2022 [2022/09/29 20:10] nchanove |
uc:uc20220906_september_6_2022 [2022/09/29 21:29] (current) nchanove |
||
---|---|---|---|
Line 10: | Line 10: | ||
* NMSU - nothing to report | * NMSU - nothing to report | ||
* Washington - nothing to report | * Washington - nothing to report | ||
- | * Wyoming - Chip had just returned from APO, where he brought 6 graduate students and 1 undergraduate for an observing/ | + | * Wyoming - Chip just returned from APO, where he brought 6 graduate students and 1 undergraduate for an observing/ |
* Georgia State - nothing to report | * Georgia State - nothing to report | ||
- | * Oklahoma | + | * Oklahoma - nothing to report |
* BYU - nothing to report | * BYU - nothing to report | ||
* Colorado - nothing to report | * Colorado - nothing to report | ||
Line 70: | Line 70: | ||
=== KOSMOS update === | === KOSMOS update === | ||
- | Over summer shutdown several KOSMOS-related tasks were accomplished. We reduced the brightness of the internal calibration lamps by putting an ND filter in place. This will affect flat fields and arc lamps, but since observers need to acquire | + | Over summer shutdown several KOSMOS-related tasks were accomplished. We reduced the brightness of the internal calibration lamps by putting an ND filter in place. This will affect |
- | + | ||
- | + | ||
- | Chip - recommendations? | + | |
- | + | ||
- | seasonal | + | |
- | + | ||
- | multi object still coming | + | |
---- | ---- | ||
Line 83: | Line 76: | ||
=== Summer shutdown recap === | === Summer shutdown recap === | ||
- | problems | + | The problems |
- | tertiary problem - still vulnerable to possible recurrence but not a frequent issue | + | |
- | telescope came back together and had good luck during initial part of recovery period, expect good pointing | + | |
---- | ---- | ||
Line 91: | Line 82: | ||
=== Q3 3.5m scheduling === | === Q3 3.5m scheduling === | ||
- | Only 1 remaining unassigned | + | There is only one remaining unassigned |
- | Sep 30A | + | |
- | no official requests yet although someone from JHU expressed interest, we told them to submit official request though Kevin, unsure if he will endorse | + | |
- | may use as overflow for Q4 | + | |
---- | ---- | ||
Line 100: | Line 88: | ||
=== Q4 3.5m scheduling === | === Q4 3.5m scheduling === | ||
- | When Q4 comes out check Q3 schedule | + | When the Q4 schedule |
---- | ---- | ||
Line 107: | Line 95: | ||
- | Free time coming up after " | + | There is some free time coming up after the week of 9/18 - the last week of the month is unassigned. Once Q4 schedule comes out we will post a call for Q4 ARCSAT |
---- | ---- | ||
- | === Meetings | + | === Upcoming |
- | ARC BoG meeting. | + | The ARC Board of Governors |
- | AAS meeting - lots of UW users, | + | The January 2023 AAS meeting |
- | Later: need help w/booth | + | We will definitely have an APO booth in the exhibit area, so in a month or two Nancy will be looking for volunteers to help us staff the booth. Stay tuned! |
Line 126: | Line 114: | ||
Open action items from previous meetings: | Open action items from previous meetings: | ||
- | * Nancy: start investigations re: short wavelength throughput (climate data, other facilities). Status: OPEN. Nancy reached out to some colleagues at other observatories to ask about short wavelength performance degradation of their optical coatings. She got some names from Bill and will contact those individuals next. The ongoing discussions about new coatings for the primary also relate to this issue so we will determine our coatings first before continuing to pursue this line of investigation. | + | * Nancy: start investigations re: short wavelength throughput (climate data, other facilities). Status: OPEN. No news. Old news: Nancy reached out to some colleagues at other observatories to ask about short wavelength performance degradation of their optical coatings. She got some names from Bill and will contact those individuals next. The ongoing discussions about new coatings for the primary also relate to this issue so we will determine our coatings first before continuing to pursue this line of investigation. |
* UC reps: notify your users of remaining open/DD time in Q3. -> CLOSED | * UC reps: notify your users of remaining open/DD time in Q3. -> CLOSED | ||
Line 132: | Line 120: | ||
* UC reps: remind your users to send Nancy all publications through 2021 by August 31, 2022. -> CLOSED | * UC reps: remind your users to send Nancy all publications through 2021 by August 31, 2022. -> CLOSED | ||
- | * Nancy: track down resources for KOSMOS flat fielding and post them. | + | * Nancy: track down resources for KOSMOS flat fielding and post them. -> CLOSED. |
New action items from this meeting: | New action items from this meeting: | ||
- | xxx | + | * UC reps: please poll your users to see if they would be interested in an APO-related event (e.g. a meal or reception one evening) during the Jan. 2023 AAS meeting. |
---- | ---- | ||
Line 143: | Line 131: | ||
=== All Other Business === | === All Other Business === | ||
- | xxx | + | None. |
---- | ---- |