User Tools

Site Tools


uc:uc20220906_september_6_2022

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
uc:uc20220906_september_6_2022 [2022/09/06 15:01]
nchanove
uc:uc20220906_september_6_2022 [2022/09/29 21:29] (current)
nchanove
Line 3: Line 3:
 ---- ----
  
-UPDATE EVERYTHING AFTER THIS: +Attending: Nancy Chanover (NMSU), Joanne Hughes (Seattle U), Eric Nielsen (NMSU), Aleksandr Mosenkov (BYU), Jamey Eriksen (APO), Misty Bentz (GSU), Anne Verbiscer (UVa), Russet McMillan (APO), Mukremin Kilic (OU), Eric Bellm (UW), Chip Kobulnicky (UWy), Ben Williams (UW), Kevin Schlaufman (JHU), Derek Buzasi (FGCU)
- +
-Attending: Nancy Chanover (NMSU), xxx Chip Kobulnicky (UWy), Bill Ketzeback (APO), Eric Bellm (UW), Eric Nielsen (NMSU), Jamey Eriksen (APO), Joanne Hughes (Seattle U), Kevin Schlaufman (JHU), Aleksandr Mosenkov (BYU), Anne Verbiscer (UVa), Misty Bentz (GSU)+
  
 === User feedback and comments from institutional representatives === === User feedback and comments from institutional representatives ===
  
-  * UVa -  +  * UVa - nothing to report  
-  * NMSU -  +  * NMSU - nothing to report 
-  * Washington -  +  * Washington - nothing to report 
-  * Wyoming -  +  * Wyoming - Chip just returned from APO, where he brought 6 graduate students and 1 undergraduate for an observing/training trip. Candace did a great job with the training and they all had a wonderful experience. 
-  * Georgia State -  +  * Georgia State - nothing to report 
-  * Oklahoma -  +  * Oklahoma - nothing to report 
-  * BYU -  +  * BYU - nothing to report 
-  * Colorado -  +  * Colorado - nothing to report 
-  * FGCU -  +  * FGCU - nothing to report 
-  * Seattle -  +  * Seattle - nothing to report 
-  * JHU -  +  * JHU - nothing to report 
-  * NAPG - +  * NAPG - no report
  
 ---- ----
Line 66: Line 64:
 === Additional telescope and instrument discussion ===  === Additional telescope and instrument discussion === 
  
-xxx+The weather at APO has been very monsoonal over the past month. September is going to be a busy month with two visiting classes, one from UWy (they were there in early September) and the other from UW, and two visiting instrument teams, The summer shutdown was completed and we are now back to normal operations. All routine shutdown maintenance activities were completed and the issue with the secondary mirror has not come back so hopefully it is resolved. Once again the 3.5m technical and operational staff did a fantastic job of conducting a successful shutdown and returning the telescope to science operations without a hitch. DIS servicing is currently scheduled for October. Ed Leon, the 3.5m electronics technician, retired on September 1. Nancy expressed her appreciation for his efforts and dedication to APO and the 3.5m over the past decade. The job ad for his position is now posted ([[https://jobs.nmsu.edu/postings/47642]]) - please share this widely and encourage people to apply!
  
 ---- ----
Line 72: Line 70:
 === KOSMOS update ===  === KOSMOS update === 
  
-xxx+Over summer shutdown several KOSMOS-related tasks were accomplished. We reduced the brightness of the internal calibration lamps by putting an ND filter in place. This will affect both flat fields and arc lamps, but since observers need to acquire arcs more frequently because of the known instrument flexure we don't want to dim those any further. We are recommending that observers use truss lamps for flat fields if the frames are still saturated. We are currently trying to see if we can address the brightness of the internal quartz lamps but not the arcs, which requires a tradeoff between the needs of narrow vs wide slit observations; no decisions have been made yet. We are optimizing the system for good arc lamp exposures for the moment. A new shutter was installed in the slit viewer camera. We hope to have the new slits from the UW shop by the end of the month. Nancy posted some info to the wiki concerning how some have been handling the flat fielding of KOSMOS data (see [[:kosmos|]]). We have gone through just about one entire cycle of seasonal changes with KOSMOS, so we are now developing a more complete understanding of its behavior with environmental changes. The multi-object capability is still coming; we hope to do some more testing during engineering time soon. 
  
 ---- ----
Line 78: Line 76:
 === Summer shutdown recap ===  === Summer shutdown recap === 
  
-xxx+The problems that we had been having with the secondary mirror have not been recurring since shutdown; we hope it was resolved by the change in hardware that was made during shutdown. We are still vulnerable to a possible recurrence of the tertiary problem we had a few months ago but this is not a frequent issue so we hope it will not recur, The telescope came back together nicely after shutdown and we had good luck during the initial part of the shutdown recovery period. We expect to have good pointing with all instruments,
  
 ---- ----
Line 84: Line 82:
 === Q3 3.5m scheduling === === Q3 3.5m scheduling ===
  
-xxx+There is only one remaining unassigned half night of time, on Sep 30A. [Note added in proof: this has now been assigned; there is no remaining open time in Q3.]
  
 ---- ----
Line 90: Line 88:
 === Q4 3.5m scheduling === === Q4 3.5m scheduling ===
  
-xxx+When the Q4 schedule comes out users should check it to verify the scheduling of their programs. We expect to publish the Q4 schedule by end of this week (i.e. on 9/9). There will be no on site classes in Q4. Several monitoring programs are requesting quarter nights in Q4. Users should copy Amanda Townsend (ajt@apo.nmsu.edu) in addition to Nancy, Ben, Russet, and their institutional scheduler on all schedule related emails.
  
 ---- ----
Line 96: Line 94:
 === Q3 ARCSAT scheduling === === Q3 ARCSAT scheduling ===
  
-xxx+ 
 +There is some free time coming up after the week of 9/18 - the last week of the month is unassigned. Once Q4 schedule comes out we will post a call for Q4 ARCSAT proposals.
  
 ---- ----
  
-=== AAS meeting planning ===+=== Upcoming Meetings === 
 + 
 +The ARC Board of Governors meeting is on Monday November 7. Nancy, Ben, and some of the observatory staff are starting to gather the relevant data and prepare their presentations. 
 + 
 +The January 2023 AAS meeting will be 8-12 January in Seattle. There will be lots of UW users there, and hopefully many from other ARC institutions and lease partners as well, We discussed options for doing something special for APO or ARC users. UC reps: please poll your users to see if they would be interested in an APO event (e.g. a meal or reception one evening) during the AAS meeting? One suggestion was to give out stickers to people with posters to indicate that they made use of APO data. Chip suggested that we try to connect those with undergraduates in attendance who are looking for graduate programs with representatives from other ARC member institutions, as a small-scale recruitment effort. Misty suggested that we start a Google Doc where people can list their APO-related posters and talks; this would help with connecting people. The abstract deadline for the meeting is Tuesday October 11! 
 + 
 +We will definitely have an APO booth in the exhibit area, so in a month or two Nancy will be looking for volunteers to help us staff the booth. Stay tuned!
  
-xxx 
  
 ---- ----
Line 110: Line 114:
 Open action items from previous meetings: Open action items from previous meetings:
  
-  * Nancy: start investigations re: short wavelength throughput (climate data, other facilities). Status: OPEN. Nancy reached out to some colleagues at other observatories to ask about short wavelength performance degradation of their optical coatings. She got some names from Bill and will contact those individuals next. The ongoing discussions about new coatings for the primary also relate to this issue so we will determine our coatings first before continuing to pursue this line of investigation.+  * Nancy: start investigations re: short wavelength throughput (climate data, other facilities). Status: OPEN. No news. Old news: Nancy reached out to some colleagues at other observatories to ask about short wavelength performance degradation of their optical coatings. She got some names from Bill and will contact those individuals next. The ongoing discussions about new coatings for the primary also relate to this issue so we will determine our coatings first before continuing to pursue this line of investigation.
  
   * UC reps: notify your users of remaining open/DD time in Q3. -> CLOSED   * UC reps: notify your users of remaining open/DD time in Q3. -> CLOSED
Line 116: Line 120:
   * UC reps: remind your users to send Nancy all publications through 2021 by August 31, 2022. -> CLOSED   * UC reps: remind your users to send Nancy all publications through 2021 by August 31, 2022. -> CLOSED
  
-  * Nancy: track down resources for KOSMOS flat fielding and post them.+  * Nancy: track down resources for KOSMOS flat fielding and post them. -> CLOSED.
  
  
 New action items from this meeting: New action items from this meeting:
  
-xxx+  * UC reps: please poll your users to see if they would be interested in an APO-related event (e.g. a meal or reception one evening) during the Jan. 2023 AAS meeting.
  
 ---- ----
Line 127: Line 131:
 === All Other Business === === All Other Business ===
  
-xxx+None.
  
 ---- ----
uc/uc20220906_september_6_2022.1662476506.txt.gz · Last modified: 2022/09/06 15:01 by nchanove